TEXAS · WELLS · FREESTONE COUNTY · REED, HUGH D. NO. 1 GAS UNIT LEASE · API 42-161-34018 · DISTRICT 05

Reed Hugh D. No. 1 Gas Unit #8

Y

Freestone County · Teague (CV-Bossier Cons.) field · Producing  · Vertical

Reed Hugh D. NO. 1 Gas Unit #8 (API 42-161-34018) is a well in Freestone County operated by Hilcorp Energy Company, completed April 15, 2008 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued October 4, 2007, permitted to 12,468 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including BMA, Pettit, Travis Peak, Bossier.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Oct 4, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,468
total depth, ft
2
permits on file
Oct 4, 2007
last permit issued
Apr 15, 2008
completed
0
cumulative oil, bbl
948K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 15, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Reed, Hugh D. No. 1 Gas Unit G-5-237736Teague (CV-Bossier Cons.)Hilcorp Energy Company10948KApr 2008 – Jul 2026

Gas, mcf lease total

Last 12 months 14,562 · prior 12 19,945(-27%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Apr 2008 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
646942-98DrillXTO Energy Inc.Jun 9, 2008Oct 4, 2007Mar 1, 200813,100
646942-99DrillXTO Energy Inc.Sep 28, 2007Oct 4, 2007Mar 1, 200813,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 15, 2008Reed Hugh D. No. 1 Gas Unit G-5-237736Teague (CV-Bossier Cons.)Hilcorp Energy CompanyProducing12,468

Formation tops

As filed on W-2/G-1. Subsea from 395 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,202-6,807
Pettit7,890-7,495
Travis Peak8,057-7,662
Bossier10,981-10,586
CVL12,119-11,724

Perforations

Perforated and open-hole intervals.

FromToType
11,01412,186Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62581511247 S
5.512,4687.875541 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 12, 2008May 20, 2008Yes
00Aug 7, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16134018, documented in the API reference.