TEXAS · WELLS · FREESTONE COUNTY · API 42-161-34019 · DISTRICT 05

B. W. Thompson Gas Unit No. 1 #18

Y

Freestone County · Farrar (Travis Peak) field · SWR-10-Well  · Vertical

B. W. Thompson Gas Unit NO. 1 #18 (API 42-161-34019) is a well in Freestone County operated by Hilcorp Energy Company, completed June 24, 2009 and listed as swr-10-well on the RRC schedule.

The RRC has issued 2 drilling permits between 2007 and 2009, permitted to 13,140 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including BMA, Pettit, Travis Peak, Cv Consolidated.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Jun 1, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,140
total depth, ft
2
permits on file
Jun 1, 2009
last permit issued
Jun 24, 2009
completed
0
cumulative oil, bbl
1.41M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 24, 2009
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thompson, B. W. Gas Unit No. 1 G-5-248000Farrar (Cotton Valley Lime)Hilcorp Energy Company101.41MJan 2009 – Jul 2026
B. W. Thompson Gas Unit No. 1 G-5-252134Farrar (Travis Peak)Hilcorp Energy Company100Jun 2009 – Jul 2026

Gas, mcf lease total

Last 12 months 35,746 · prior 12 38,334(-7%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Jan 2009 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
681617-99RecompletionXTO Energy Inc.May 28, 2009Jun 1, 2009Jun 6, 200913,140
646965-99DrillXTO Energy Inc.Sep 28, 2007Oct 4, 2007Dec 6, 200814,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 24, 2009B. W. Thompson Gas Unit No. 1 G-5-252134Farrar (Travis Peak)Hilcorp Energy CompanySWR-10-Well · shut in Jun 1, 200913,140
Jun 24, 2009Thompson B. W. Gas Unit No. 1 G-5-248000Farrar (Cotton Valley Lime)Hilcorp Energy CompanyProducing13,140

Formation tops

As filed on W-2/G-1. Subsea from 475 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,843-7,368
Pettit8,571-8,096
Travis Peak8,832-8,357
CV Consolidated11,471-10,996
BossierBOSSIER SANDS12,461-11,986

Perforations

Perforated and open-hole intervals.

FromToType
8,9419,456Perforated
11,49512,857Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,40012.25447 S
5.513,1258.752,066 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 4, 2010Jul 20, 2009—
00Oct 29, 2009——
00Jul 16, 2009Apr 6, 2009Yes
00Jun 12, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16134019, documented in the API reference.