TEXAS · WELLS · FREESTONE COUNTY · MONTGOMERY, WELDON GAS UNIT II LEASE · API 42-161-34234 · DISTRICT 05

Montgomery Weldon Gas Unit II #1

Shut in

Freestone County · Teague (CV-Bossier Cons.) field · Producing  · Vertical

Montgomery Weldon Gas Unit II #1 (API 42-161-34234) is a well in Freestone County operated by Hilcorp Energy Company, completed December 8, 2014 and listed as producing on the RRC schedule, shut in August 1, 2026.

The RRC has issued one drilling permit, issued August 4, 2008, permitted to 12,683 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 7 formation tops, including BMA, Pettit, Travis Peak, Knowles.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Feb 2026
Latest permitXTO Energy Inc.Aug 4, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,683
total depth, ft
1
permits on file
Aug 4, 2008
last permit issued
Dec 8, 2014
completed
0
cumulative oil, bbl
235K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 8, 2014
Shut in
Aug 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Montgomery, Weldon Gas Unit II G-5-253525Teague (CV-Bossier Cons.)Hilcorp Energy Company10235KSep 2009 – Jul 2026

Gas, mcf lease total

Last 12 months 20 · prior 12 1,533(-99%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Sep 2009 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
666766-99DrillXTO Energy Inc.Jul 15, 2008Aug 4, 2008Jun 30, 200913,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 8, 2014Montgomery Weldon Gas Unit II G-5-253525Teague (CV-Bossier Cons.)Hilcorp Energy CompanyProducing · shut in Aug 1, 202612,683

Formation tops

As filed on W-2/G-1. Subsea from 491 ft elevation.Download CSV →

FormationMD ftSubsea
BMA6,779-6,288
Pettit7,394-6,903
Travis Peak7,596-7,105
Knowles9,821-9,330
Bossier10,710-10,219
Cotton ValleyCOTTON VALLEY LIME12,313-11,822
CVL12,313-11,822

Perforations

Perforated and open-hole intervals.

FromToType
10,15010,426Perforated
10,15010,680Perforated
10,73812,550Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62578510.625240 S
5.512,6838.751,645 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 9, 2015Mar 6, 2015—
00Nov 8, 2013Oct 10, 2013—
00Feb 17, 2010Oct 20, 2009Yes
00Dec 18, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16134234, documented in the API reference.