TEXAS · WELLS · FREESTONE COUNTY · API 42-161-34348 · DISTRICT 05

Irvin Gas Unit #19

Y

Freestone County · Teague (Travis Peak) field · SWR-10-Well  · Vertical

Irvin Gas Unit #19 (API 42-161-34348) is a well in Freestone County operated by Hilcorp Energy Company, completed August 29, 2010 and listed as swr-10-well on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued January 13, 2009, permitted to 10,600 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including BMA, Pettit, Travis Peak, Knowles.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Jan 13, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,600
total depth, ft
2
permits on file
Jan 13, 2009
last permit issued
Aug 29, 2010
completed
0
cumulative oil, bbl
1.56M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 29, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Irvin Gas Unit G-5-256850Teague (CV-Bossier Cons.)Hilcorp Energy Company101.56MMay 2010 – Jul 2026
Irvin Gas Unit G-5-259982Teague (Travis Peak)Hilcorp Energy Company100Aug 2010 – Jul 2026

Gas, mcf lease total

Last 12 months 9,804 · prior 12 11,346(-14%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.May 2010 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
676924-98DrillXTO Energy Inc.May 17, 2010Jan 13, 2009Aug 17, 201013,100
676924-99DrillXTO Energy Inc.Dec 31, 2008Jan 13, 2009Jul 6, 201013,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 29, 2010Irvin Gas Unit G-5-259982Teague (Travis Peak)Hilcorp Energy CompanySWR-10-Well · shut in Aug 1, 201010,600
Aug 29, 2010Irvin Gas Unit G-5-256850Teague (CV-Bossier Cons.)Hilcorp Energy CompanyProducing10,600

Formation tops

As filed on W-2/G-1. Subsea from 528 ft elevation.Download CSV →

FormationMD ftSubsea
BMA7,392-6,864
Pettit8,053-7,525
Travis Peak8,275-7,747
Knowles10,418-9,890

Perforations

Perforated and open-hole intervals.

FromToType
8,5969,444Perforated
10,42410,434Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,05011296 S
5.510,6007.875896 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 15, 2011Mar 7, 2011—
00Sep 13, 2010Jul 1, 2010Yes
00Aug 11, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16134348, documented in the API reference.