TEXAS · WELLS · FREESTONE COUNTY · GILLIAM, J. A. GAS UNIT LEASE · API 42-161-34469 · DISTRICT 05

Gilliam J. A. Gas Unit #18

Y

Freestone County · Freestone (CV-Bossier Cons.) field · Producing  · Vertical

Gilliam J. A. Gas Unit #18 (API 42-161-34469) is a well in Freestone County operated by Hilcorp Energy Company, completed May 19, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued September 21, 2009, permitted to 12,958 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including Pettit, Travis Peak, Knowles, Bossier.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Sep 21, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,958
total depth, ft
3
permits on file
Sep 21, 2009
last permit issued
May 19, 2010
completed
0
cumulative oil, bbl
1.07M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 19, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gilliam, J. A. Gas Unit G-5-256964Freestone (CV-Bossier Cons.)Hilcorp Energy Company101.07MMay 2010 – Jul 2026

Gas, mcf lease total

Last 12 months 32,727 · prior 12 31,588(+4%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.May 2010 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
685274-97DrillXTO Energy Inc.Mar 3, 2010Sep 21, 2009Mar 9, 201013,500
685274-98DrillXTO Energy Inc.Dec 28, 2009Sep 21, 2009—12,100
685274-99DrillXTO Energy Inc.Sep 18, 2009Sep 21, 2009—12,100

Completions

CompletedLeaseFieldOperatorStatusDepth
May 19, 2010Gilliam J. A. Gas Unit G-5-256964Freestone (CV-Bossier Cons.)Hilcorp Energy CompanyProducing12,958

Formation tops

As filed on W-2/G-1. Subsea from 445 ft elevation.Download CSV →

FormationMD ftSubsea
Pettit7,738-7,293
Travis Peak7,965-7,520
Knowles10,154-9,709
Bossier11,044-10,599
CVL12,512-12,067

Perforations

Perforated and open-hole intervals.

FromToType
12,80612,886Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62592512.25325 S
5.512,9588.752,365 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 13, 2010Jun 28, 2010Yes
00Aug 25, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16134469, documented in the API reference.