WELL · 42-163-30101 · DISTRICT 1

Harlan R. K. #2

Plugged

Frio County · Doering Ranch (Georgetown) field  · Vertical

Harlan R. K. #2 (API 42-163-30101) is a plugged well in Frio County, plugged April 24, 2026, last operated by Trailblazer Energy Resources LLC.

The RRC has issued one drilling permit, issued February 24, 2006, permitted to 6,400 ft.

It was permitted by Virtex Petroleum Company, Inc. and has since transferred to Trailblazer Energy Resources LLC on the wellbore schedule.

Completion filings report one formation top, including See Original Form G-1.

Operator of record

Trailblazer Energy Resources LLC

Permitted by Virtex Petroleum Company, Inc.; the EWA schedule now lists a different operator.

Based in
Tulsa, OK
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Permits on file
30
Phone
(918) 728-3020

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrailblazer Energy Resources LLC
Production reportsTrailblazer Energy Resources,llcthrough Mar 2024
Latest permitVirtex Petroleum Company, Inc.Feb 24, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,400
total depth, ft
1
permits on file
Feb 24, 2006
last permit issued
Feb 17, 2006
completed
0
cumulative oil, bbl
425K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 17, 2006
Shut in
—
Plugged
Apr 24, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Harlan, R. K. G-1-214724Doering Ranch (Georgetown)Trailblazer Energy Resources,llc10133KFeb 2006 – Jul 2026
Doering, Frank G-1-67182Doering Ranch (Buda)Virtex Petroleum Company, Inc.10292KJan 1993 – Feb 2006

Gas, mcf lease total

Last 12 months 0 · prior 12 0

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Denovo Oil & Gas, Inc.Jan 1993 → Apr 1994
  2. 2Lomak Production CompanyMay 1994 → Jan 1995
  3. 3Virtex Petroleum Company, Inc.Feb 1995 → Jan 2008
  4. 4Virtex Operating Company, Inc.Feb 2008 → Aug 2023
  5. 5Trailblazer Energy Resources,llcSep 2023 → Mar 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
614848-99RecompletionVirtex Petroleum Company, Inc.Feb 24, 2006Feb 24, 2006—6,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 17, 2006Harlan R. K. G-1-214724Doering Ranch (Georgetown)Trailblazer Energy Resources LLCPlugged—
Jun 10, 1976Doering Frank G-1-67182Doering Ranch (Buda)Virtex Petroleum Company Inc.Plugged—
Nov 1, 1975— G-1-64442Doering Ranch (Sligo)Goldking Prod. Co.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 567 ft elevation.Download CSV →

FormationMD ftSubsea
See Original Form G-1——

Perforations

Perforated and open-hole intervals.

FromToType
6,3726,397Perforated
9,86510,165Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,02014.75550 S
10.751,02015550 S
5.510,3009.8752,110 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 17, 2006Mar 1, 2006Yes
00Mar 27, 2006——
00Jan 12, 1984Jul 13, 1976—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16330101, documented in the API reference.