WELL · 42-163-31680 · DISTRICT 1
Keystone #2
Frio County · Vertical
Keystone #2 (API 42-163-31680) is a permitted well in Frio County filed by Light Resources; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1979 and 2013, permitted to 6,850 ft.
Its 2 leases have reported 81.5K barrels of oil and 27.1K mcf of gas since January 1993, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- San Antonio, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- May 30, 2013
- Permits on file
- 2
- Phone
- (830) 334-7598
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Oilfield Cleantech Water Rec LLCthrough Aug 2014 |
| Latest permit | Light ResourcesOct 26, 2013 |
- 6,850
- total depth, ft
- 2
- permits on file
- Oct 26, 2013
- last permit issued
- —
- completed
- 81.5K
- cumulative oil, bbl
- 27.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Keystone/Keystone Ranch O-1-13870 | Pearsall (Austin Chalk) | Oilfield Cleantech Water Rec LLC | 3 | 42.4K | 27K | Jun 1994 – Jul 2026 |
| Keystone O-1-6001 | Pearsall (Austin Chalk) | Light Resources | 4 | 39.1K | 23 | Jan 1993 – Apr 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Oryx Energy CompanyJan 1993 → Dec 1993
- 2HPC Operating, Inc.Jan 1994 → May 1994
- 3Freedom Energy, Inc. (I)Jun 1994 → Sep 1998
- 4Penrod Oil Company of Texas, IncAug 1994 → Sep 1994
- 5Mobile Production Systems, Inc.Oct 1994 → Oct 1994
- 6Pearsall Energy Group, Inc.Nov 1994 → Dec 1994
- 7Ginco Operating Co.Jun 1995 → Oct 1995
- 8Light ResourcesJun 1996 → Apr 2010
- 9Oilfield Cleantech Water Rec LLCOct 2013 → Aug 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 771680-99 | Recompletion | Light Resources | Oct 14, 2013 | Oct 26, 2013 | — | 6,700 |
| 43597-99 | Drill | Fair Energy | Mar 2, 1979 | Mar 2, 1979 | — | 6,850 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-6001 | — | — | — | — |
| — | — O-1-13870 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,300 | 6,427 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 525 | 12.25 | 350 S |
| 2.375 | 6,275 | — | — |
| 4.5 | 6,850 | 7.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 13, 1994 | May 21, 1979 | — |
| 00 | Oct 3, 1989 | May 21, 1979 | — |
| 00 | Sep 29, 1989 | — | — |
| 00 | Jan 12, 1984 | May 21, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-163-31680 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-163-31680 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16331680, documented in the API reference.