TEXAS · WELLS · FRIO COUNTY · HARLAN, R. K. LEASE · API 42-163-33307 · DISTRICT 01

Harlan R. K. #7

Shut in

Frio County · Doering Ranch (Georgetown) field · Temp Abandoned  · Vertical

Harlan R. K. #7 (API 42-163-33307) is a well in Frio County operated by Trailblazer Energy Resources LLC, completed January 9, 2003 and listed as temp abandoned on the RRC schedule, shut in May 1, 2022.

The RRC has issued one drilling permit, issued November 15, 2002, permitted to 6,668 ft.

It was permitted by Virtex Petroleum Company, Inc. and has since transferred to Trailblazer Energy Resources LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Olmos, Anacacho, Austin Chalk.

No lease production has been reported under this well’s leases.

Operator of record

Trailblazer Energy Resources LLC

Permitted by Virtex Petroleum Company, Inc.; the EWA schedule now lists a different operator.

Based in
Tulsa, OK
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Permits on file
30
Phone
(918) 728-3020

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrailblazer Energy Resources LLC
Production reportsVirtex Operating Company, Inc.through Apr 2022
Latest permitVirtex Petroleum Company, Inc.Nov 15, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,668
total depth, ft
1
permits on file
Nov 15, 2002
last permit issued
Jan 9, 2003
completed
0
cumulative oil, bbl
61.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 9, 2003
Shut in
May 1, 2022
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Harlan, R. K. G-1-194191Doering Ranch (Georgetown)Trailblazer Energy Resources,llc1061.5KJan 2003 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Virtex Petroleum Company, Inc.Feb 2003 → Jan 2008
  2. 2Virtex Operating Company, Inc.Feb 2008 → Apr 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
525569-99DrillVirtex Petroleum Company, Inc.Nov 15, 2002Nov 15, 2002Nov 20, 20026,650

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 9, 2003Harlan R. K. G-1-194191Doering Ranch (Georgetown)Trailblazer Energy Resources LLCTemp Abandoned · shut in May 1, 20226,668

Formation tops

As filed on W-2/G-1. Subsea from 543 ft elevation.Download CSV →

FormationMD ftSubsea
Olmos4,115-3,572
Anacacho5,130-4,587
Austin Chalk5,515-4,972

Perforations

Perforated and open-hole intervals.

FromToType
6,0846,118Perforated
6,1446,229Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62577813.5365 S
5.56,6568.751,035 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 16, 2009Jun 17, 2009—
00May 28, 2003Mar 26, 2003Yes
00May 7, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16333307, documented in the API reference.