WELL · 42-163-33308 · DISTRICT 1

Harlan R. K. #6

Shut in

Frio County · Doering Ranch (Georgetown) field · Temp Abandoned  · Vertical

Harlan R. K. #6 (API 42-163-33308) is a well in Frio County operated by Trailblazer Energy Resources LLC, completed January 20, 2003 and listed as temp abandoned on the RRC schedule, shut in August 1, 2024.

The RRC has issued 2 drilling permits between 2002 and 2006, permitted to 6,664 ft.

It was permitted by Virtex Petroleum Company, Inc. and has since transferred to Trailblazer Energy Resources LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Olmos, Anacacho, Austin Chalk.

No lease production has been reported under this well’s leases.

Operator of record

Trailblazer Energy Resources LLC

Permitted by Virtex Petroleum Company, Inc.; the EWA schedule now lists a different operator.

Based in
Tulsa, OK
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Permits on file
30
Phone
(918) 728-3020

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrailblazer Energy Resources LLC
Production reportsTrailblazer Energy Resources,llcthrough Jul 2024
Latest permitVirtex Petroleum Company, Inc.Apr 6, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,664
total depth, ft
2
permits on file
Apr 6, 2006
last permit issued
Jan 20, 2003
completed
0
cumulative oil, bbl
547K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 20, 2003
Shut in
Aug 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Harlan, R. K. G-1-194195Doering Ranch (Georgetown)Trailblazer Energy Resources,llc10547KJan 2003 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 2,307(-100%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Virtex Petroleum Company, Inc.Jan 2003 → Jan 2008
  2. 2Virtex Operating Company, Inc.Feb 2008 → Aug 2023
  3. 3Trailblazer Energy Resources,llcSep 2023 → Jul 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
616862-99Field transferVirtex Petroleum Company, Inc.Mar 31, 2006Apr 6, 2006—6,664
525637-99DrillVirtex Petroleum Company, Inc.Nov 18, 2002Nov 18, 2002Dec 7, 20026,650

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 20, 2003Harlan R. K. G-1-194195Doering Ranch (Georgetown)Trailblazer Energy Resources LLCTemp Abandoned · shut in Aug 1, 20246,664
Jan 20, 2003Harlan R. K. G-1-194195Doering Ranch (Georgetown)Trailblazer Energy Resources LLCTemp Abandoned · shut in Aug 1, 20246,664

Formation tops

As filed on W-2/G-1. Subsea from 562 ft elevation.Download CSV →

FormationMD ftSubsea
Olmos4,060-3,498
Anacacho5,090-4,528
Austin Chalk5,450-4,888

Perforations

Perforated and open-hole intervals.

FromToType
6,3676,373Perforated
6,3796,383Perforated
6,3866,394Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62578513.25365 S
9.62578513.5365 S
5.56,6508.751,370 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 2, 2006May 1, 2006—
00May 23, 2003Mar 26, 2003Yes
00May 7, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16333308, documented in the API reference.