TEXAS · WELLS · FRIO COUNTY · HOYLE-KOTHMANN LEASE · API 42-163-33565 · DISTRICT 01

Hoyle-Kothmann #1H

Shut in

Frio County · Doering Ranch (Georgetown) field · Shut In  · Horizontal

Hoyle-Kothmann #1H (API 42-163-33565) is a horizontal well in Frio County operated by Trailblazer Energy Resources LLC, completed April 16, 2012 and listed as shut in on the RRC schedule, shut in March 1, 2024.

The RRC has issued one drilling permit, issued February 7, 2012, permitted to 5,919 ft.

It was permitted by Virtex Operating Company, Inc. and has since transferred to Trailblazer Energy Resources LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Escondido, Olmos, Anacacho.

Its lease has reported 101K barrels of oil and 261K mcf of gas since April 2012, last reporting in July 2026.

Operator of record

Trailblazer Energy Resources LLC

Permitted by Virtex Operating Company, Inc.; the EWA schedule now lists a different operator.

Based in
Tulsa, OK
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Permits on file
30
Phone
(918) 728-3020

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrailblazer Energy Resources LLC
Production reportsVirtex Operating Company, Inc.through Jun 2023
Latest permitVirtex Operating Company, Inc.Feb 7, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,919
total depth, ft
1
permits on file
Feb 7, 2012
last permit issued
Apr 16, 2012
completed
101K
cumulative oil, bbl
261K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 16, 2012
Shut in
Mar 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hoyle-Kothmann O-1-16512Doering Ranch (Georgetown)Trailblazer Energy Resources,llc1101K261KApr 2012 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

050100202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

01202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Virtex Operating Company, Inc.Apr 2012 → May 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
732603-99DrillVirtex Operating Company, Inc.Jan 27, 2012Feb 7, 2012Feb 16, 20126,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 16, 2012Hoyle-Kothmann O-1-16512Doering Ranch (Georgetown)Trailblazer Energy Resources LLCShut In · shut in Mar 1, 20245,919

Formation tops

As filed on W-2/G-1. Subsea from 525 ft elevation.Download CSV →

FormationMD ftSubsea
Escondido2,940-2,415
Olmos4,009-3,484
Anacacho4,931-4,406

Perforations

Perforated and open-hole intervals.

FromToType
6,16610,054Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,70512.25740 S
76,1668.75375 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 19, 2013Jun 19, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16333565, documented in the API reference.