TEXAS · WELLS · FRIO COUNTY · CHILIPITIN, LTD. LEASE · API 42-163-33637 · DISTRICT 01

Chilipitin Ltd. #101H

Plugged

Frio County · Indio Tanks (Pearsall) field  · Horizontal

Chilipitin Ltd. #101H (API 42-163-33637) is a plugged horizontal well in Frio County, plugged April 22, 2016, last operated by Javelin Energy Partners Mgmt LLC.

The RRC has issued one drilling permit (amended once), issued August 9, 2012, permitted to 15,000 ft.

It was permitted by Cabot Oil & Gas Corporation and has since transferred to Javelin Energy Partners Mgmt LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Glen Rose, Rodessa, Upper Bexar (Pearsall).

Its lease has reported 34.9K barrels of oil and 83.8K mcf of gas since January 2013, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Javelin Energy Partners Mgmt LLC

Permitted by Cabot Oil & Gas Corporation; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 24, 2026
Permits on file
233
Phone
(469) 575-3800

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJavelin Energy Partners Mgmt LLC
Production reportsVenado Operating Company LLCthrough Aug 2020
Latest permitCabot Oil & Gas CorporationAug 9, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,000
total depth, ft
2
permits on file
Aug 9, 2012
last permit issued
Apr 15, 2013
completed
34.9K
cumulative oil, bbl
83.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 15, 2013
Shut in
—
Plugged
Apr 22, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Chilipitin, Ltd. O-1-17190Indio Tanks (Pearsall)Javelin Energy Partners Mgmt LLC334.9K83.8KJan 2013 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cabot Oil & Gas CorporationJan 2013 → Jan 2018
  2. 2Venado Operating Company LLCFeb 2018 → Aug 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
745676-98DrillCabot Oil & Gas CorporationMay 3, 2013Aug 9, 2012Feb 17, 201315,000
745676-99DrillCabot Oil & Gas CorporationAug 1, 2012Aug 9, 2012Feb 17, 201315,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 15, 2013Chilipitin Ltd. O-1-17190Indio Tanks (Pearsall)Javelin Energy Partners Mgmt LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 529 ft elevation.Download CSV →

FormationMD ftSubsea
Glen RoseLOWER GLEN ROSE8,465-7,936
Rodessa9,614-9,085
Upper Bexar (Pearsall)9,732-9,203

Perforations

Perforated and open-hole intervals.

FromToType
9,82314,212Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,88513.51,057 S
7.6259,8259.875279 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 11, 2014May 6, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16333637, documented in the API reference.