TEXAS · WELLS · FRIO COUNTY · O'NEILL-BIEL UNIT LEASE · API 42-163-33650 · DISTRICT 01

O Neill-Biel Unit #1H

Y

Frio County · Doering Ranch (Georgetown) field · Producing  · Horizontal

O Neill-Biel Unit #1H (API 42-163-33650) is a horizontal well in Frio County operated by Trailblazer Energy Resources LLC, completed August 8, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued September 13, 2012, permitted to 6,194 ft.

It was permitted by Virtex Operating Company, Inc. and has since transferred to Trailblazer Energy Resources LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Anacacho, Austin Chalk, Eagle Ford, Buda.

Its lease has reported 76.1K barrels of oil and 634K mcf of gas since October 2012, last reporting in July 2026.

Operator of record

Trailblazer Energy Resources LLC

Permitted by Virtex Operating Company, Inc.; the EWA schedule now lists a different operator.

Based in
Tulsa, OK
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Permits on file
30
Phone
(918) 728-3020

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrailblazer Energy Resources LLC
Production reportsTrailblazer Energy Resources,llcthrough Apr 2026
Latest permitVirtex Operating Company, Inc.Sep 13, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,194
total depth, ft
2
permits on file
Sep 13, 2012
last permit issued
Aug 8, 2013
completed
76.1K
cumulative oil, bbl
634K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 8, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
O'Neill-Biel Unit O-1-17785Doering Ranch (Georgetown)Trailblazer Energy Resources,llc176.1K634KOct 2012 – Jul 2026

Gas, mcf lease total

Last 12 months 23,447 · prior 12 29,691(-21%)

05K10K202420252026

Oil, barrels lease total

Last 12 months 1,833 · prior 12 2,076(-12%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Virtex Operating Company, Inc.Oct 2012 → Aug 2023
  2. 2Trailblazer Energy Resources,llcSep 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
747512-98DrillVirtex Operating Company, Inc.Feb 5, 2013Sep 13, 2012Sep 29, 20127,000
747512-99DrillVirtex Operating Company, Inc.Aug 31, 2012Sep 13, 2012Sep 29, 20127,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 8, 2013O Neill-Biel Unit O-1-17785Doering Ranch (Georgetown)Trailblazer Energy Resources LLCProducing6,194

Formation tops

As filed on W-2/G-1. Subsea from 540 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho5,181-4,641
Austin Chalk5,569-5,029
Eagle Ford5,993-5,453
Buda6,149-5,609

Perforations

Perforated and open-hole intervals.

FromToType
6,0416,041Perforated
6,38011,210Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,78912.25755 S
76,0518.75360 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 7, 2014Aug 19, 2013Yes
00Sep 26, 2014Mar 13, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16333650, documented in the API reference.