TEXAS · WELLS · GAINES COUNTY · RILEY, T. S. "D" LEASE · API 42-165-00043 · DISTRICT 7B

Riley T. S. D #8

Plugged

Gaines County · Seminole (San Andres) field  · Vertical

Riley T. S. D #8 (API 42-165-00043) is a plugged well in Gaines County, plugged April 22, 2026, last operated by Hilcorp Energy Company.

The RRC has issued one drilling permit, issued August 30, 1989, permitted to 5,600 ft.

It was permitted by Arco Oil & Gas CO. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Operator of record

Hilcorp Energy Company

Permitted by Arco Oil & Gas Co.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsnone
Latest permitArco Oil & Gas Co.Aug 30, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,600
total depth, ft
1
permits on file
Aug 30, 1989
last permit issued
Feb 27, 1993
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 27, 1993
Shut in
—
Plugged
Apr 22, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Riley, T. S. "D" O-11-66441Seminole (San Andres)Hilcorp Energy Company100Jan 1993 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
363247-99RecompletionArco Oil & Gas Co.Aug 28, 1989Aug 30, 1989—5,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 27, 1993Riley T. S. D O-11-66441Seminole (San Andres)Hilcorp Energy CompanyPlugged—
—Riley T. S. D O-11-10231Seminole (Wolfcamp)Arco Oil & Gas Co.Plugged—
—Riley T. S. D O-11-10231Seminole (Wolfcamp)Arco Oil & Gas Co.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
5,2645,450Perforated
—9,120Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.375374—389 S
9.6254,761—2,600 S
5.59,089—942 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 29, 1993Mar 16, 1993—
00Jan 22, 1992Jan 6, 1992—
00Jan 12, 1990Dec 12, 1989Yes
00Jan 4, 1990——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
6.62M
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000026279H-1 InjectionPlugged Apr 29, 20262,0002,5005,264–5,450

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16500043, documented in the API reference.