TEXAS · WELLS · GAINES COUNTY · API 42-165-02247 · DISTRICT 7B
South Robertson (San Andres) U. #7
Gaines County · Harris (San Andres) field · Shut In · Vertical
South Robertson (San Andres) U. #7 (API 42-165-02247) is a well in Gaines County operated by Crescent Energy Operating LLC, completed November 16, 1983 and listed as shut in on the RRC schedule, shut in January 1, 2026.
The RRC has issued one drilling permit, issued December 2, 1983, permitted to 4,670 ft.
It was permitted by Samedan Oil Corporation and has since transferred to Crescent Energy Operating LLC on the wellbore schedule.
Its 5 leases have reported 23.9M barrels of oil and 10.7M mcf of gas since January 1993, last reporting in July 2026. The leases carry 268 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Samedan Oil Corporation; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Aug 28, 2025
- Permits on file
- 54
- Phone
- (713) 337-4600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Crescent Energy Operating LLC |
| Production reports | Crescent Energy Operating, LLCthrough Apr 2026 |
| Latest permit | Samedan Oil CorporationDec 2, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,670
- total depth, ft
- 1
- permits on file
- Dec 2, 1983
- last permit issued
- Nov 16, 1983
- completed
- 23.9M
- cumulative oil, bbl
- 10.7M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 16, 1983
- Shut in
- Jan 1, 2026
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 268 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| South Central Robertson Unit O-11-62596 | Robertson, N. (Clear Fork 7100) | Crescent Energy Operating, LLC | 145 | 20.4M | 10M | Jan 1993 – Jul 2026 |
| South Robertson (San Andres) U. O-11-71167 | Harris (San Andres) | Crescent Energy Operating, LLC | 55 | 138K | 12.2K | Mar 2020 – Jul 2026 |
| South Robertson (San Andres) U. O-11-67419 | Robertson, N. (San Andres) | Contango Resources, Inc. | 60 | 3.31M | 722K | Aug 1995 – Jan 2022 |
| Andrews "A" O-11-67308 | Robertson, N. (San Andres) | Samedan Oil Corporation | 4 | 3.27K | 0 | Dec 1994 – Nov 1995 |
| Andrews "A" O-11-61866 | Robertson (San Andres) | Samedan Oil Corporation | 4 | 10.2K | 21 | Jan 1993 – Apr 1995 |
Oil, barrels lease total
Last 12 months 235,719 · prior 12 211,849(+11%)
Gas, mcf lease total
Last 12 months 76,825 · prior 12 95,753(-20%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Samedan Oil CorporationJan 1993 → Dec 2002
- 2Noble Energy IncJan 2003 → Jul 2012
- 3Sheridan Production Company, LLCAug 2012 → Mar 2020
- 4FDL Operating, LLCMar 2020 → Nov 2021
- 5Contango Resources, LLCDec 2021 → Oct 2025
- 6Contango Resources, Inc.Dec 2021 → Dec 2021
- 7Crescent Energy Operating, LLCNov 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 222217-99 | Recompletion | Samedan Oil Corporation | Nov 21, 1983 | Dec 2, 1983 | — | 4,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 16, 1983 | South Robertson (San Andres) U. O-11-71167 | Harris (San Andres) | Crescent Energy Operating LLC | Shut In · shut in Jan 1, 2025 | 4,670 |
| — | South Central Robertson Unit O-11-62596 | Robertson N. (Clear Fork 7100) | Crescent Energy Operating LLC | Shut In · shut in Jan 1, 2026 | 4,670 |
| Nov 16, 1983 | South Robertson (San Andres) U. O-11-67419 | Robertson N. (San Andres) | Contango Resources Inc. | Not on Schedule | — |
| Nov 16, 1983 | Andrews A O-11-67308 | Robertson N. (San Andres) | Samedan Oil Corporation | Not on Schedule | — |
| Nov 16, 1983 | Andrews A O-11-61866 | Robertson (San Andres) | Samedan Oil Corporation | Not on Schedule | — |
| — | Andrews -A- O-11-18305 | Robertson N. (Clear Fork 7100) | Samedan Oil Corporation | Not on Schedule | — |
| — | South Central Robertson Unit O-11-62595 | Robertson | Samedan Oil Corporation | Not on Schedule | — |
| — | Andrews -A- O-11-5110 | Robertson | Samedan Oil Corporation | Not on Schedule | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,428 | 4,670 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 297 | — | — |
| 7.625 | 3,102 | — | — |
| 2.375 | 4,580 | — | — |
| 4.5 | 6,651 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 22, 2021 | Nov 22, 1983 | — |
| 00 | Aug 18, 1995 | Nov 22, 1983 | — |
| 00 | Nov 15, 1994 | Nov 22, 1983 | — |
| 00 | Jan 12, 1984 | Nov 22, 1983 | — |
| 00 | Jan 12, 1984 | Oct 9, 1959 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-165-02247 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-165-02247 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16502247, documented in the API reference.