TEXAS · WELLS · GAINES COUNTY · API 42-165-02820 · DISTRICT 7B
Jones Edward H. C #5
Gaines County · Russell (Clearfork Consolidated field · Producing · Vertical
Jones Edward H. C #5 (API 42-165-02820) is a well in Gaines County operated by Hilcorp Energy Company, completed March 3, 1995 and listed as producing on the RRC schedule.
The RRC has issued 4 drilling permits between 1978 and 1995, permitted to 7,766 ft.
It was permitted by Cross Timbers Operating Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Its 3 leases have reported 231K barrels of oil and 124K mcf of gas since January 1993, last reporting in July 2026. The leases carry 10 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Cross Timbers Operating Company; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Cross Timbers Operating CompanyFeb 27, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,766
- total depth, ft
- 4
- permits on file
- Feb 27, 1995
- last permit issued
- Mar 3, 1995
- completed
- 231K
- cumulative oil, bbl
- 124K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 3, 1995
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jones, Edward H. "C" O-11-5204 | Russell (Glorieta 6100) | Hilcorp Energy Company | 5 | 130K | 73.3K | Jan 1993 – Jul 2026 |
| Jones, Edward H. "C" O-11-68868 | Russell (Clearfork Consolidated | Hilcorp Energy Company | 4 | 67K | 35.4K | Nov 2005 – Jul 2026 |
| Jones, Edward H. "C" O-11-67362 | Russell, North (6600) | XTO Energy Inc. | 1 | 34.1K | 15.8K | Mar 1995 – Apr 2006 |
Oil, barrels lease total
Last 12 months 3,533 · prior 12 3,020(+17%)
Gas, mcf lease total
Last 12 months 1,115 · prior 12 915(+22%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1E.G. OperatingJan 1993 → Oct 1993
- 2Cross Timbers Operating CompanyNov 1993 → May 2001
- 3XTO Energy Inc.Jun 2001 → Mar 2025
- 4Hilcorp Energy CompanyApr 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 433107-99 | Recompletion | Cross Timbers Operating Company | Feb 21, 1995 | Feb 27, 1995 | Jan 21, 1995 | 6,867 |
| 234941-99 | Recompletion | Tenneco Oil Co. | Mar 27, 1984 | Mar 27, 1984 | — | 7,766 |
| 223878-99 | Recompletion | Tenneco Oil Co. | Dec 9, 1983 | Dec 13, 1983 | — | 7,766 |
| 17299-99 | Recompletion | Tenneco Oil Co. | Jan 30, 1978 | Jan 30, 1978 | — | 7,766 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 3, 1995 | Jones Edward H. C O-11-68868 | Russell (Clearfork Consolidated | Hilcorp Energy Company | Producing | 7,766 |
| Mar 3, 1995 | Jones Edward H. C O-11-67362 | Russell North (6600) | XTO Energy Inc. | Not on Schedule | — |
| Jan 13, 1984 | Jones Edward H. C O-11-5204 | Russell (Glorieta 6100) | Hilcorp Energy Company | Not on Schedule | — |
| Jan 13, 1984 | Jones Edward H. C O-11-5204 | Russell (Glorieta 6100) | Hilcorp Energy Company | Not on Schedule | — |
| — | Jones E. H. -B- O-11-62176 | Russell North (6600) | Tenneco Oil Co. | Not on Schedule | — |
| — | Jones Edward H. C O-11-5220 | Russell (Clearfork 7000) | XTO Energy Inc. | Not on Schedule | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,985 | 5,995 | Perforated |
| 6,020 | 6,102 | Perforated |
| 6,122 | 6,130 | Perforated |
| 6,150 | 6,190 | Perforated |
| 6,680 | 6,739 | Perforated |
| 7,344 | 7,766 | Open hole |
| — | 7,350 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 448 | 17 | 450 S |
| 13.375 | 449 | 17 | 450 S |
| 9.625 | 4,208 | 12.25 | 2,000 S |
| 9.625 | 4,506 | 12.25 | 2,000 S |
| 7 | 7,344 | 8.75 | 450 S |
| 7 | 7,349 | 8.75 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 31, 2006 | Mar 14, 1995 | Yes |
| 00 | Apr 10, 1995 | Mar 14, 1995 | Yes |
| 00 | Mar 17, 1995 | — | — |
| 00 | Jul 2, 1984 | Feb 21, 1984 | — |
| 00 | Jun 20, 1984 | Feb 21, 1984 | — |
| 00 | Jun 13, 1984 | Feb 21, 1984 | — |
| 00 | Jan 12, 1984 | Apr 28, 1978 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-165-02820 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-165-02820 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16502820, documented in the API reference.