WELL · 42-165-31326 · DISTRICT 8

Neill Otis #1

Plugged

Gaines County · V & S (San Andres) field  · Vertical

Neill Otis #1 (API 42-165-31326) is a plugged well in Gaines County, plugged January 31, 1997, last operated by Kinney Incorporated.

The RRC has issued one drilling permit, issued February 9, 1978, permitted to 5,100 ft.

It was permitted by Estoril Producing Corporation and has since transferred to Kinney Incorporated on the wellbore schedule.

Its lease has reported 42.5K barrels of oil and 135 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Kinney Incorporated

Permitted by Estoril Producing Corporation; the EWA schedule now lists a different operator.

Based in
Andrews, TX
P-5 status
Active (A)
P-5 last filed
Jun 18, 2026
Permits on file
5
Phone
(432) 523-2960

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleShenandoah Petroleum Corporation
Production reportsKinney Incorporatedthrough Apr 2026
Latest permitEstoril Producing CorporationFeb 9, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,100
total depth, ft
1
permits on file
Feb 9, 1978
last permit issued
Mar 15, 1978
completed
42.5K
cumulative oil, bbl
135
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 15, 1978
Shut in
—
Plugged
Jan 31, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Neill, Otis O-11-64747V & S (San Andres)Kinney Incorporated242.5K135Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 957 · prior 12 1,075(-11%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shenandoah Petroleum CorporationJan 1993 → Aug 1994
  2. 2Brothers Production Company Inc.Sep 1994 → Oct 2001
  3. 3Smith & Marrs Inc.Nov 2001 → Aug 2002
  4. 4BC Operating, Inc.Sep 2002 → Oct 2004
  5. 5Celero Energy, L.P.Nov 2004 → Sep 2005
  6. 6Whiting Oil and Gas CorporationOct 2005 → Jul 2006
  7. 7Kinney IncorporatedAug 2006 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
18585-99DrillEstoril Producing CorporationFeb 9, 1978Feb 9, 1978Feb 4, 19785,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 15, 1978Neil O-11-62118V & S (San Andres)Shenandoah Petroleum CorporationPlugged—
Mar 15, 1978Neill Otis O-11-64747V & S (San Andres)Kinney IncorporatedPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
—4,986Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62538011225 S
4.55,0407.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 9, 1990Mar 31, 1978—
00May 3, 1990——
00Jan 12, 1984Mar 31, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

13.3K
bbl, last 12 reported months
164K
bbl, all reported
Oct 1996
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000072959H-1 InjectionPlugged Feb 21, 19978002,4504,950–4,986

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 13,318 · prior 12 20,924(-36%)

01K2K3K19951996

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16531326, documented in the API reference.