TEXAS · WELLS · GAINES COUNTY · API 42-165-33359 · DISTRICT 7B

North Robertson San Andres Unit #10

On schedule

Gaines County · Harris (San Andres) field · Producing  · Vertical

North Robertson San Andres Unit #10 (API 42-165-33359) is a well in Gaines County operated by Citation Oil & Gas Corp., completed April 12, 2012 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 10, 1985, permitted to 4,710 ft.

It was permitted by Exxon Corp. and has since transferred to Citation Oil & Gas Corp. on the wellbore schedule.

Completion filings report 5 formation tops, including Yates, Seven Rivers, Queen, Grayburg.

Its 3 leases have reported 2.23M barrels of oil and 1.39M mcf of gas since the record begins in January 1993, last reporting volume in April 2026. The leases carry 162 wells, so these are lease totals, not this well alone.

Operator of record

Citation Oil & Gas Corp.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
May 27, 2026
Permits on file
867
Phone
(281) 891-1000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCitation Oil & Gas Corp.
Production reportsCitation Oil & Gas Corp.through Apr 2026
Latest permitExxon Corp.Sep 10, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,710
total depth, ft
1
permits on file
Sep 10, 1985
last permit issued
Apr 12, 2012
completed
2.23M
cumulative oil, bbl
1.39M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · ON RECORD FROM JAN 1993, THE RECORD'S FIRST MONTH, THROUGH APR 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 12, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 162 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
North Robertson San Andres Unit O-11-71163Harris (San Andres)Citation Oil & Gas Corp.78797K519KFeb 2020 – Apr 2026
North Robertson San Andres Unit O-11-70072Robertson, N. (San Andres)Citation Oil & Gas Corp.731.3M744KDec 2013 – Feb 2020
Exxon Fee "D" O-11-64924Robertson, N. (San Andres)Citation Oil & Gas Corp.11141K122Kby Jan 1993 – Nov 2013

Oil, barrels lease total

Last 12 months 92,903 · prior 12 109,914(-15%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 68,231 · prior 12 69,532(-2%)

05K10K202420252026

Wells named North Robertson San Andres Unit

Citation Oil & Gas Corp.'s other wells filed under this lease name in Gaines County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Aug 2003
  3. 3Citation Oil & Gas Corp.Sep 2003 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
284758-99DrillExxon Corp.Sep 9, 1985Sep 10, 1985Sep 24, 19854,750

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 12, 2012North Robertson San Andres Unit O-11-71163Harris (San Andres)Citation Oil & Gas Corp.Producing4,710
Apr 12, 2012North Robertson San Andres Unit O-11-70072Robertson N. (San Andres)Citation Oil & Gas Corp.Not on Schedule—
Apr 12, 2012Exxon Fee D O-11-64924Robertson N. (San Andres)Citation Oil & Gas Corp.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 3,338 ft elevation.Download CSV →

FormationMD ftSubsea
Yates2,796542
Seven Rivers3,033305
Queen3,850-512
Grayburg4,047-709
San Andres4,374-1,036
San Andres4,608-1,270

Perforations

Perforated and open-hole intervals.

FromToType
4,6074,670Perforated
4,6084,670Perforated
4,6434,656Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,8048.625910 S
8.6251,80412.25910 S
5.54,7107.8751,625 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 3, 2021Apr 30, 2012—
00Jan 9, 2014Apr 30, 2012—
00Nov 27, 2012Apr 30, 2012—
00Aug 25, 2006Apr 24, 2006—
00Nov 20, 1985Nov 6, 1985Yes
00Nov 15, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16533359, documented in the API reference.