TEXAS · WELLS · GAINES COUNTY · API 42-165-33584 · DISTRICT 8A

Texaco "22" #1

Plugged

Gaines County  · Vertical

Texaco "22" #1 (API 42-165-33584) is a plugged well in Gaines County, plugged January 19, 1987, last operated by Western Reserves Oil Company Inc.

The RRC has issued one drilling permit, issued December 29, 1986, permitted to 7,800 ft.

Operator of record

Western Reserves Oil Company Inc

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Jun 18, 2020
Permits on file
126
Phone
(432) 683-5533

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitWestern Reserves Oil Company IncDec 29, 1986
7,800
total depth, ft
1
permits on file
Dec 29, 1986
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 19, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
324234-99DrillWestern Reserves Oil Company IncDec 11, 1986Dec 29, 1986—7,800

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16533584, documented in the API reference.