TEXAS · WELLS · GAINES COUNTY · BICE, SARAH E. "A" & "C" LEASE · API 42-165-34119 · DISTRICT 7B

Bice Sarah E. a & C #10

Shut in

Gaines County · Adair field · Shut In  · Vertical

Bice Sarah E. A & C #10 (API 42-165-34119) is a well in Gaines County operated by Hilcorp Energy Company, completed February 3, 2014 and listed as shut in on the RRC schedule, shut in February 1, 2014.

The RRC has issued one drilling permit, issued November 20, 1989, permitted to 4,900 ft.

It was permitted by Texaco Producing Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report one formation top, including San Andres.

Its lease has reported 623K barrels of oil and 28.6K mcf of gas since January 1993, last reporting in July 2026. The lease carries 18 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Hilcorp Energy Company

Permitted by Texaco Producing Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitTexaco Producing Inc.Nov 20, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,900
total depth, ft
1
permits on file
Nov 20, 1989
last permit issued
Feb 3, 2014
completed
623K
cumulative oil, bbl
28.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 3, 2014
Shut in
Feb 1, 2014
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 18 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bice, Sarah E. "a" & "C" O-11-19650AdairHilcorp Energy Company18623K28.6KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 6,340 · prior 12 6,571(-4%)

05001K202420252026

Gas, mcf lease total

Last 12 months 44 · prior 12 327(-87%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Feb 1995
  2. 2Apache CorporationMar 1995 → Nov 2024
  3. 3Hilcorp Energy CompanyDec 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
366528-99DrillTexaco Producing Inc.Nov 16, 1989Nov 20, 1989—4,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 3, 2014Bice Sarah E. a & C O-11-19650AdairHilcorp Energy CompanyShut In · shut in Feb 1, 20144,900
Jan 25, 1990Bice Sarah E. a & C O-11-19650AdairHilcorp Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 3,180 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres4,830-1,650

Perforations

Perforated and open-hole intervals.

FromToType
4,8284,860Perforated
4,8284,876Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,00012.251,450 S
5.54,9007.8751,100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 26, 2014Feb 24, 2014—
00Mar 9, 1999Aug 13, 1997—
00Feb 23, 1999Feb 12, 1990Yes
00Feb 23, 1990Feb 12, 1990Yes
00Feb 17, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
327K
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000086059H-1 InjectionActive5002,0004,800–5,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16534119, documented in the API reference.