TEXAS · WELLS · GAINES COUNTY · API 42-165-34225 · DISTRICT 7B
West Seminole SA Unit #508
Gaines County · Seminole West field · Injection · Vertical
West Seminole SA Unit #508 (API 42-165-34225) is a well in Gaines County operated by Oxy USA Wtp LP, completed April 21, 2025 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued September 24, 1990, permitted to 5,300 ft.
It was permitted by Oxy USA Inc. and has since transferred to Oxy USA Wtp LP on the wellbore schedule.
Completion filings report 4 formation tops, including Yates, Queen, Grayburg, San Andres.
Its 2 leases have reported 18.3M barrels of oil and 59.5M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 227 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 231K barrels injected in the 12 months reported through October 2025.
Operator of record
Permitted by OXY USA Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 16, 2025
- Permits on file
- 2,289
- Phone
- (713) 215-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | OXY USA WTP LP |
| Production reports | OXY USA WTP LPthrough Apr 2026 |
| Latest permit | OXY USA Inc.Sep 24, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,300
- total depth, ft
- 1
- permits on file
- Sep 24, 1990
- last permit issued
- Apr 21, 2025
- completed
- 18.3M
- cumulative oil, bbl
- 59.5M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 21, 2025
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 227 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| West Seminole SA Unit O-11-17310 | Seminole, West | OXY USA WTP LP | 226 | 18.2M | 55.7M | Jan 1993 – Apr 2026 |
| West Seminole SA Unit G-11-171885 | Seminole, West | OXY USA WTP LP | 1 | 21.5K | 3.73M | Jul 1998 – Jul 2013 |
Oil, barrels lease total
Last 12 months 1,315,451 · prior 12 1,395,720(-6%)
Gas, mcf lease total
Last 12 months 3,364,915 · prior 12 3,848,328(-13%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1OXY USA Inc.Jan 1993 → Dec 2000
- 2OXY USA WTP LPJan 2001 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 378255-99 | Drill | OXY USA Inc. | Sep 21, 1990 | Sep 24, 1990 | Nov 20, 1990 | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 21, 2025 | West Seminole SA Unit O-11-17310 | Seminole West | OXY USA WTP LP | Injection | 5,300 |
| Apr 17, 2014 | West Seminole SA Unit G-11-171885 | Seminole West | OXY USA WTP LP | Not on Schedule | — |
| Mar 7, 1992 | West Seminole SA Unit O-11-17310 | Seminole West | OXY USA WTP LP | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,466 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yates | 3,109 | 357 |
| Yates | 3,110 | 356 |
| Yates | 3,112 | 354 |
| Queen | 3,380 | 86 |
| Grayburg | 4,304 | -838 |
| San Andres | 4,572 | -1,106 |
| San Andres | 4,580 | -1,114 |
| San Andres | 4,703 | -1,237 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,884 | 5,242 | Perforated |
| 4,884 | 5,252 | Perforated |
| 4,885 | 5,025 | Perforated |
| 5,050 | 5,088 | Perforated |
| 5,050 | 5,252 | Perforated |
| 5,095 | 5,252 | Perforated |
| 5,108 | 5,252 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,013 | 12.25 | 900 S |
| 5.5 | 5,098 | 7.875 | 1,000 S |
| 5.5 | 5,298 | 7.875 | 1,000 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 13, 2025 | Jun 3, 2025 | — |
| 00 | Nov 22, 2024 | May 22, 2024 | — |
| 00 | Aug 4, 2016 | Aug 3, 2016 | — |
| 00 | Aug 25, 2014 | Aug 5, 2014 | — |
| 00 | Mar 23, 1999 | Nov 23, 1998 | — |
| 00 | Feb 26, 1999 | — | — |
| 00 | Jun 10, 1992 | May 4, 1992 | — |
| 00 | Jan 31, 1991 | Jan 17, 1991 | Yes |
| 00 | Jan 21, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-165-34225 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-165-34225 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 231K
- bbl, last 12 reported months
- 4.15M
- bbl, all reported
- Oct 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000114070 | H-1 Injection | Active | 5,000 | 2,400 | 4,800–6,000 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 230,728 · prior 12 172,620(+34%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16534225, documented in the API reference.