WELL · 42-165-34487 · DISTRICT 8

Branex/American C #2

Y

Gaines County · Stockyard (Clearfork Upper) field · Shut IN  · Vertical

Branex/American C #2 (API 42-165-34487) is a well in Gaines County operated by Ciervo Resources Asset Hldg LLC, completed January 25, 2019 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued June 8, 1992, permitted to 7,000 ft.

It was permitted by Primero Operating, Inc. and has since transferred to Ciervo Resources Asset Hldg LLC on the wellbore schedule.

Completion filings report 2 formation tops, including San Andres, Glorieta.

Its lease has reported 3.12K barrels of oil and 408 mcf of gas since April 1993, last reporting in July 2026.

Operator of record

Ciervo Resources Asset Hldg LLC

Permitted by Primero Operating, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jan 4, 2026 · (832) 563-3001

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCiervo Resources Asset Hldg LLC
Production reportsPrimero Operating, Inc.through Aug 1994
Latest permitPrimero Operating, Inc.Jun 8, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,000
total depth, ft
1
permits on file
Jun 8, 1992
last permit issued
Jan 25, 2019
completed
3.12K
cumulative oil, bbl
408
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 25, 2019
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Branex/American 'C' O-11-67060Stockyard (Clearfork, Upper)Ciervo Resources Asset Hldg, LLC13.12K408Apr 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Primero Operating, Inc.Apr 1993 → Apr 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
399541-99DrillPrimero Operating, Inc.May 21, 1992Jun 8, 1992Jun 12, 19927,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-67060————

Formation tops

As filed on W-2/G-1. Subsea from 3,542 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres4,530-988
San Andres4,538-996
GlorietaGLORIETTA5,918-2,376

Perforations

Perforated and open-hole intervals.

FromToType
5,9446,311Perforated
6,5026,594Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,93412.25850 S
5.56,6807.8751,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 12, 2019Feb 11, 2019—
00Aug 2, 1995Jul 11, 1995—
00Jun 4, 1993May 21, 1993Yes
00May 26, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Oct 2022
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089522H-1 InjectionNot activated1,0003,0006,400–6,650

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120212022

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16534487, documented in the API reference.