WELL · 42-165-34937 · DISTRICT 8

O.D.C. #2

Y

Gaines County · Seagraves (San Andres) field · Injection  · Vertical

O.D.C. #2 (API 42-165-34937) is a well in Gaines County operated by Mcclure Oil Company Inc., completed March 29, 2024 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued December 29, 1995, permitted to 5,700 ft.

It was permitted by Miltex Oil Company and has since transferred to Mcclure Oil Company Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Rustler, Yates, San Andres.

Its lease has reported 14.3K barrels of oil since February 1996, last reporting in July 2026.

It holds an active disposal or injection permit, with 17.4K barrels injected in the 12 months reported through October 2025.

Operator of record

McClure Oil Company Inc.

Permitted by Miltex Oil Company; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Aug 4, 2025 · 343 permits on file · (432) 683-2787

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcClure Oil Company Inc.
Production reportsCholla Petroleum, Inc.through Oct 2017
Latest permitMiltex Oil CompanyDec 29, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,700
total depth, ft
1
permits on file
Dec 29, 1995
last permit issued
Mar 29, 2024
completed
14.3K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 29, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
O.D.C. O-11-67552Seagraves (San Andres)McClure Oil Company, Inc.114.3K0Feb 1996 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Miltex Oil CompanyMar 1996 → Oct 2010
  2. 2Nadel and Gussman Permian,l.l.c.Nov 2010 → Aug 2014
  3. 3Cholla Petroleum, Inc.Oct 2017 → Oct 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
443314-99DrillMiltex Oil CompanyDec 29, 1995Dec 29, 1995Jan 21, 19965,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-67552————

Formation tops

As filed on W-2/G-1. Subsea from 3,397 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler2,428969
Yates3,470-73
San Andres5,133-1,736

Perforations

Perforated and open-hole intervals.

FromToType
5,5925,602Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62537412.25220 S
55,6357.8751,490 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 11, 2024May 21, 2024—
00May 9, 1996Mar 25, 1996Yes
00Apr 15, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

17.4K
bbl, last 12 reported months
40.8K
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000125864H-1 InjectionActive1,5002,7505,500–5,635

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 17,440 · prior 12 23,376(-25%)

05K10K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16534937, documented in the API reference.