WELL · 42-165-35873 · DISTRICT 8
Higg Ranch 30 #1
Gaines County · Diamante (Wolfcamp) field · Vertical
Higg Ranch 30 #1 (API 42-165-35873) is a well in Gaines County operated by Hilcorp Energy Company, completed March 12, 2003.
The RRC has issued one drilling permit, issued August 30, 2002, permitted to 10,000 ft.
It was permitted by Platinum Exploration Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 3 formation tops, including San Andres, Glorieta, Clear Fork.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit.
Operator of record
Permitted by Platinum Exploration Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | none |
| Latest permit | Platinum Exploration Inc.Aug 30, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,000
- total depth, ft
- 1
- permits on file
- Aug 30, 2002
- last permit issued
- Mar 12, 2003
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 12, 2003
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Higg Ranch "30" O-11-68569 | Diamante (Wolfcamp) | Hilcorp Energy Company | 2 | 0 | 0 | Mar 2003 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 522458-99 | Drill | Platinum Exploration Inc. | Aug 2, 2002 | Aug 30, 2002 | Sep 14, 2002 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-68569 | — | — | — | — |
| — | — O-11-68569 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,603 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 4,910 | -1,307 |
| Glorieta | 5,949 | -2,346 |
| Clear ForkCLEARFORK | 6,087 | -2,484 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,168 | 9,319 | Perforated |
| 9,168 | 9,445 | Perforated |
| 9,470 | 9,700 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 368 | 17.5 | 425 S |
| 8.625 | 4,481 | 11 | 1,750 S |
| 5.5 | 9,470 | 7.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 29, 2004 | Sep 19, 2003 | — |
| 00 | Dec 9, 2003 | Apr 16, 2003 | Yes |
| 00 | Jun 18, 2003 | Apr 16, 2003 | Yes |
| 00 | May 22, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-165-35873 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-165-35873 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 32.3M
- bbl, all reported
- Oct 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000093166 | H-1 Injection | Active | 15,000 | 4,575 | 9,150–9,700 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16535873, documented in the API reference.