WELL · 42-165-36110 · DISTRICT 8
Children S Home #1
Gaines County · Ritz (San Andres) field · Vertical
Children S Home #1 (API 42-165-36110) is a plugged well in Gaines County, plugged May 5, 2024, last operated by Joint Resources Company.
The RRC has issued one drilling permit, issued February 4, 2004, permitted to 9,600 ft.
It was permitted by Tamarack Petroleum Company, Inc. and has since transferred to Joint Resources Company on the wellbore schedule.
Completion filings report one formation top, including San Andres.
Operator of record
Permitted by Tamarack Petroleum Company, Inc.; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 9, 2026
- Permits on file
- 241
- Phone
- (817) 289-1414
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Joint Resources Company |
| Production reports | Joint Resources Companythrough Sep 2023 |
| Latest permit | Tamarack Petroleum Company, Inc.Feb 4, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,600
- total depth, ft
- 1
- permits on file
- Feb 4, 2004
- last permit issued
- Mar 31, 2004
- completed
- 0
- cumulative oil, bbl
- 507K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2004 THROUGH Jun 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 31, 2004
- Shut in
- —
- Plugged
- May 5, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Children's Home G-11-205850 | Ritz (San Andres) | Joint Resources Company | 1 | 0 | 507K | Mar 2004 – Jun 2024 |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tamarack Petroleum Company, Inc.Sep 2004 → Jul 2016
- 2Beck Resources IncorporatedAug 2016 → Jun 2018
- 3Joint Resources CompanyAug 2018 → Sep 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 541343-99 | Drill | Tamarack Petroleum Company, Inc. | Jan 28, 2004 | Feb 4, 2004 | Feb 14, 2004 | 9,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-11-205850 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,599 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 4,854 | -1,255 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,253 | 5,545 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 340 | 17.5 | 330 S |
| 8.625 | 4,964 | 12.25 | 1,745 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 26, 2005 | Sep 21, 2004 | Yes |
| 00 | Feb 2, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-165-36110 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-165-36110 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16536110, documented in the API reference.