WELL · 42-165-38532 · DISTRICT 8

Shusa 15 #1W

Y

Gaines County · Harris (San Andres) field · Injection  · Directional

Shusa 15 #1W (API 42-165-38532) is a well in Gaines County operated by Zarvona Energy LLC, completed April 16, 2017 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued February 22, 2017, permitted to 5,100 ft.

Completion filings report 10 formation tops, including Yates, Queen, San Andres, Clear Fork.

Its lease has reported 948K barrels of oil and 72.4K mcf of gas since August 2003, last reporting in July 2026. The lease carries 23 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 390K barrels injected in the 12 months reported through October 2025.

Operator of record

Zarvona Energy LLC

Houston, TX · P-5 Y, filed Mar 4, 2026 · 98 permits on file · (713) 600-0600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleZarvona Energy LLC
Production reportsZarvona Energy LLCthrough Apr 2026
Latest permitZarvona Energy LLCFeb 22, 2017
5,100
total depth, ft
1
permits on file
Feb 22, 2017
last permit issued
Apr 16, 2017
completed
948K
cumulative oil, bbl
72.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 16, 2017
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 23 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Shusa "15" O-11-68612Harris (San Andres)Zarvona Energy LLC23948K72.4KAug 2003 – Jul 2026

Oil, barrels lease total

Last 12 months 33,457 · prior 12 37,735(-11%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 1,935(-100%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jetta Operating Company, Inc.Aug 2003 → Aug 2013
  2. 2Zarvona Energy LLCSep 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
823222-99DrillZarvona Energy LLCFeb 13, 2017Feb 22, 2017Apr 9, 20175,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-68612————

Formation tops

As filed on W-2/G-1. Subsea from 3,264 ft elevation.Download CSV →

FormationMD ftSubsea
YatesYATES - OVERPRESSURE, INERT GAS1,8561,408
Queen3,736-472
San AndresSAN ANDRES - ACTIVE CO2 FLOOD4,541-1,277
Clear ForkCLEARFORK——
Glorieta——
Leonard——
San Angelo——
Seven Rivers——
Spraberry——
Wichita-AlbanyWICHITA ALBANY——

Perforations

Perforated and open-hole intervals.

FromToType
4,6384,889Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,85312.25900 S
4.55,0977.875950 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 24, 2017Jul 19, 2017—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

390K
bbl, last 12 reported months
2.08M
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000115330H-1 InjectionActive1,5002,2754,450–5,100

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 389,925 · prior 12 309,683(+26%)

020K40K60K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16538532, documented in the API reference.