TEXAS · WELLS · GALVESTON COUNTY · API 42-167-30698 · DISTRICT 03

Orchard Oil Unit #6 O/A #2

Plugged

Galveston County · Algoa Orchard (8900) field  · Vertical

Orchard Oil Unit #6 O/A #2 (API 42-167-30698) is a plugged well in Galveston County, plugged November 16, 1984, last operated by Texaco Inc..

The RRC has issued 2 drilling permits between 1978 and 1979, permitted to 8,892 ft.

Operator of record

Texaco Inc.

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 27, 1996
Permits on file
4,906
Phone
(432) 688-4643

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexaco Inc.
Production reportsnone
Latest permitTexaco Inc.Apr 24, 1979
8,892
total depth, ft
2
permits on file
Apr 24, 1979
last permit issued
Feb 9, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 9, 1984
Shut in
—
Plugged
Nov 16, 1984

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
49455-99DrillTexaco Inc.Apr 24, 1979Apr 24, 1979—8,892
40768-99DrillTexaco Inc.Dec 29, 1978Dec 29, 1978Jan 21, 19798,892

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 9, 1984Orchard Oil Unit #6 O/A O-3-7542Algoa Orchard (8900)Texaco Inc.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
8,8628,866Perforated
8,8748,880Perforated
8,8888,892Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,23012.25650 S
2.3756,017——
5.59,0128.75300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 11, 1984Mar 1, 1984—
00Jan 12, 1984Mar 1, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16730698, documented in the API reference.