TEXAS · WELLS · GALVESTON COUNTY · G-3-138719 LEASE · API 42-167-31191 · DISTRICT 03
Campbell Eugenia et Al #1A
Galveston County · Alta Loma West (Banfield) field · Vertical
Campbell Eugenia ET AL #1A (API 42-167-31191) is a plugged well in Galveston County, plugged October 9, 1991, last operated by Ballard Exploration Company Inc..
The RRC has issued one drilling permit (amended once), issued March 11, 1991, permitted to 12,500 ft.
Completion filings report 5 formation tops, including Frio, Tex. Miss (Banfield Sd), Schenck Sands, Weiting Sands.
Operator of record
Ballard Exploration Company Inc.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 4, 2026
- Permits on file
- 464
- Phone
- (713) 651-0181
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ballard Exploration Company Inc. |
| Production reports | none |
| Latest permit | Ballard Exploration Company,inc.Mar 11, 1991 |
- 12,500
- total depth, ft
- 2
- permits on file
- Mar 11, 1991
- last permit issued
- Apr 30, 1991
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 30, 1991
- Shut in
- —
- Plugged
- Oct 9, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-3-138719 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 385576-98 | Drill | Ballard Exploration Company,inc. | Jun 12, 1991 | Mar 11, 1991 | Mar 11, 1991 | 12,500 |
| 385576-99 | Drill | Ballard Exploration Company,inc. | Mar 11, 1991 | Mar 11, 1991 | — | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 30, 1991 | Campbell Eugenia et Al G-3-138719 | Alta Loma West (Banfield) | Ballard Exploration Company Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 21 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| FrioFRIO SAND | 8,968 | -8,947 |
| Tex. Miss (Banfield SD) | 11,190 | -11,169 |
| Schenck Sands | 11,328 | -11,307 |
| Weiting Sands | 11,626 | -11,605 |
| 'S' Sand | 12,370 | -12,349 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,184 | 11,193 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,520 | 14.75 | 2,385 S |
| 7 | 11,780 | 9.875 | 920 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 6, 1991 | Jun 14, 1991 | Yes |
| 00 | Jul 24, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-167-31191 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-167-31191 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16731191, documented in the API reference.