WELL · 42-167-31225 · DISTRICT 3

Trust #1D

Plugged

Galveston County  · Directional

Trust #1D (API 42-167-31225) is a plugged well in Galveston County, plugged April 21, 1993, last operated by Cometra Oil And Gas, Inc..

The RRC has issued 2 drilling permits between 1992 and 1994, permitted to 9,800 ft.

Completion filings report 3 formation tops, including Anahuac, Frio, Alibel.

Its lease has reported 435K barrels of oil and 367K mcf of gas since April 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Cometra Oil and Gas, Inc.

Based in
Fort Worth, TX
P-5 status
Inactive (I)
P-5 last filed
Dec 3, 1996
Permits on file
134
Phone
(817) 877-1585

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHilcorp Energy Companythrough Jun 2021
Latest permitCometra Oil and Gas, Inc.Aug 24, 1994
9,800
total depth, ft
2
permits on file
Aug 24, 1994
last permit issued
—
completed
435K
cumulative oil, bbl
367K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 21, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Trust O-3-21999Franks, NW. (8900)Hilcorp Energy Company3435K367KApr 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cometra Oil and Gas, Inc.Apr 1993 → Feb 1997
  2. 2Lomak Production CompanyMar 1997 → Aug 1998
  3. 3Range Production CompanySep 1998 → Dec 1999
  4. 4Hilcorp Energy CompanySep 2000 → Jun 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
427335-99ReenterCometra Oil and Gas, Inc.Aug 24, 1994Aug 24, 1994Jul 20, 19942,322
407096-99DrillCometra Oil and Gas, Inc.Dec 10, 1992Dec 10, 1992—9,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-21999————

Formation tops

As filed on W-2/G-1. Subsea from 23 ft elevation.Download CSV →

FormationMD ftSubsea
Anahuac7,104-7,081
Frio8,908-8,885
Alibel9,460-9,437

Perforations

Perforated and open-hole intervals.

FromToType
2,0962,106Perforated
2,0962,200Perforated
2,1222,132Perforated
2,1512,168Perforated
2,1762,186Perforated
2,1902,200Perforated
2,2822,292Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,49414.751,455 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 9, 2022Dec 15, 2021—
00Mar 26, 2010Oct 29, 2008—
00Dec 13, 2007Jun 6, 2007—
00May 5, 1995Apr 20, 1995—
00Aug 30, 1994Aug 9, 1994—
00Aug 25, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
9.21M
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000080999W-14 DisposalActive3,0008751,750–2,430

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16731225, documented in the API reference.