WELL · 42-167-31233 · DISTRICT 3

Trust Unit #3

Y

Galveston County · Franks NW. (8900) field · Shut IN  · Vertical

Trust Unit #3 (API 42-167-31233) is a well in Galveston County operated by Hilcorp Energy Company, completed August 9, 2024 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued May 28, 1993, permitted to 9,500 ft.

It was permitted by Cometra Oil And Gas, Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including Catahoula, Miocene (undifferentiated), Franks (8900), Franks 8900.

Its lease has reported 1.08M barrels of oil and 362K mcf of gas since February 1994, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Hilcorp Energy Company

Permitted by Cometra Oil and Gas, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitCometra Oil and Gas, Inc.May 28, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,500
total depth, ft
2
permits on file
May 28, 1993
last permit issued
Aug 9, 2024
completed
1.08M
cumulative oil, bbl
362K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 9, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Trust Unit O-3-22288Franks, NW. (8900)Hilcorp Energy Company21.08M362KFeb 1994 – Jul 2026

Oil, barrels lease total

Last 12 months 31,333 · prior 12 35,612(-12%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 114 · prior 12 51,780(-100%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cometra Oil and Gas, Inc.Feb 1994 → Feb 1997
  2. 2Lomak Production CompanyMar 1997 → Aug 1998
  3. 3Range Production CompanySep 1998 → Jul 2000
  4. 4Hilcorp Energy CompanyAug 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
412241-98DrillCometra Oil and Gas, Inc.Nov 5, 1993May 28, 1993Dec 13, 19939,500
412241-99DrillCometra Oil and Gas, Inc.May 28, 1993May 28, 1993—9,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-22288————

Formation tops

As filed on W-2/G-1. Subsea from 23 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula3,115-3,092
Miocene (undifferentiated)MIOCENE6,720-6,697
Miocene (undifferentiated)MIOCENE BASE6,720-6,697
Miocene (undifferentiated)BASE OF MIOCENE6,770-6,747
Franks (8900)8,800-8,777
Franks 89008,800-8,777
Franks (8900)8,890-8,867

Perforations

Perforated and open-hole intervals.

FromToType
8,8928,902Perforated
8,8928,921Perforated
8,9008,935Perforated
8,9118,921Perforated
8,9158,925Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,92012.25623 S
5.59,1008.75450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 18, 2024Oct 10, 2024—
00Oct 31, 2013Oct 2, 2013—
00May 15, 2007Mar 20, 2007—
00Jun 5, 2006Dec 30, 2005—
00Mar 11, 1994Feb 15, 1994Yes
00Mar 4, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000126633H-1 InjectionActive10,0002,0008,892–8,940

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16731233, documented in the API reference.