WELL · 42-169-31558 · DISTRICT 8
Connell Estate "29" #S 2WD
Garza County · Vertical
Connell Estate "29" #S 2WD (API 42-169-31558) is a plugged well in Garza County, plugged August 14, 1982, last operated by Patterson Petroleum, Inc..
The RRC has issued 3 drilling permits (amended once) between 1980 and 1990, permitted to 3,700 ft.
Completion filings report 2 formation tops, including San Andres, Glorieta.
Operator of record
Snyder, TX · P-5 Y, filed Jul 7, 2000 · 436 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Patterson Petroleum, Inc.Jan 8, 1990 |
- 3,700
- total depth, ft
- 4
- permits on file
- Jan 8, 1990
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Aug 14, 1982
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Connell Estate "29" O-11-66816 | Rocker -a-, NW. (San Andres) | Patterson Petroleum, Inc. | 1 | 0 | 0 | Jan 1993 – Sep 1997 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 368164-98 | Reenter | Patterson Petroleum, Inc. | Jul 13, 1990 | Jan 8, 1990 | — | 3,556 |
| 368164-99 | Reenter | Patterson Petroleum, Inc. | Jan 2, 1990 | Jan 8, 1990 | — | 3,556 |
| 120852-99 | Drill | Powell & Stone | May 28, 1981 | May 28, 1981 | Jun 13, 1981 | 3,556 |
| 76399-99 | Drill | Powell & Stone | Mar 27, 1980 | Mar 27, 1980 | — | 3,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-66816 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,500 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 2,300 | 200 |
| Glorieta | 3,475 | -975 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,300 | 2,600 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 210 | 12.25 | 145 S |
| 4.5 | 3,555 | 7.875 | 1,100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 25, 1992 | May 25, 1990 | — |
| 00 | Mar 5, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-169-31558 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-169-31558 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 75.3K
- bbl, last 12 reported months
- 1.74M
- bbl, all reported
- May 1997
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000072687 | H-1 Injection | Plugged Aug 22, 1997 | 2,500 | 1,100 | 2,300–3,000 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 75,278 · prior 12 104,790(-28%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16931558, documented in the API reference.