WELL · 42-169-31965 · DISTRICT 8

Kirkpatrick A #3

N

Garza County · Garza (Glorieta) field  · Vertical

Kirkpatrick A #3 (API 42-169-31965) is a well in Garza County operated by Stelzer J. C., completed February 27, 1983.

The RRC has issued one drilling permit, issued October 21, 1982, permitted to 3,600 ft.

Completion filings report 2 formation tops, including San Andres, Glorieta.

Its 2 leases have reported 294K barrels of oil and 20 mcf of gas since January 1993, last reporting in July 2026. The leases carry 10 wells, so these are lease totals, not this well alone.

Operator of record

Stelzer J. C.

Post, TX · P-5 Y, filed Aug 2, 1996 · 117 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStelzer J. C.
Production reportsStelzer Drilling Co. Inc.through Apr 2026
Latest permitStelzer, J. C.Oct 21, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,600
total depth, ft
1
permits on file
Oct 21, 1982
last permit issued
Feb 27, 1983
completed
294K
cumulative oil, bbl
20
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 27, 1983
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kirkpatrick "A" O-11-64305GarzaStelzer Drilling Co. Inc.9294K20Jan 1993 – Jul 2026
Kirkpatrick "A" O-11-64373Garza (Glorieta)Stelzer, J. C.100Jan 1993 – Dec 1995

Oil, barrels lease total

Last 12 months 4,778 · prior 12 5,160(-7%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stelzer, J. C.Jan 1993 → Oct 1995
  2. 2Stelzer Drilling Co. Inc.Nov 1995 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
175027-99DrillStelzer, J. C.Oct 21, 1982Oct 21, 1982—3,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-64305————
—— O-11-64373————

Formation tops

As filed on W-2/G-1. Subsea from 2,448 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres2,248200
San Andres2,702-254
Glorieta3,377-929

Perforations

Perforated and open-hole intervals.

FromToType
2,8152,955Perforated
2,8152,956Perforated
3,4493,472Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62521812.25125 S
2.3752,750——
1.253,400——
5.53,5807.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 14, 1991Apr 5, 1991—
00Dec 20, 1985Dec 3, 1985Yes
00Jan 12, 1984Apr 25, 1983—
00Jan 12, 1984Mar 21, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
90.7K
bbl, all reported
Aug 1992
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000048384W-14 DisposalCanceled Mar 25, 1993000–3,472
000058335H-1 InjectionCanceled May 2, 1991002,815–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 16,997(-100%)

01K2K3K19911992

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16931965, documented in the API reference.