TEXAS · WELLS · GARZA COUNTY · API 42-169-32835 · DISTRICT 7B

Miller #1A

Plugged

Garza County · Rocker -a- South (Glorieta) field  · Vertical

Miller #1A (API 42-169-32835) is a plugged well in Garza County, plugged July 22, 1988, last operated by Permian Resources Inc..

The RRC has issued one drilling permit, issued December 15, 1987, permitted to 3,500 ft.

Operator of record

Permian Resources Inc.

Based in
Midland, TX
P-5 status
Delinquent (D)
P-5 last filed
Aug 14, 2006
Permits on file
95
Phone
(432) 685-0113

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePermian Resources Inc.
Production reportsnone
Latest permitPermian Resources, Inc.Dec 15, 1987
3,500
total depth, ft
1
permits on file
Dec 15, 1987
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jul 22, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
339932-99DrillPermian Resources, Inc.Dec 9, 1987Dec 15, 1987—3,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—Miller O-11-66245Rocker -a- South (Glorieta)Permian Resources Inc.Plugged—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 8, 1988—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.