WELL · 42-169-33432 · DISTRICT 8
Connell Estate 937 #18
Garza County · Post (Glorieta) field · Vertical
Connell Estate 937 #18 (API 42-169-33432) is a plugged well in Garza County, plugged May 22, 2001, last operated by Wheeler Operating Corporation.
The RRC has issued one drilling permit, issued January 15, 1997, permitted to 5,500 ft.
Completion filings report one formation top, including San Andres.
Its lease has reported 30.1K barrels of oil and 9.84K mcf of gas since October 1996, last reporting in August 2001. The lease carries 19 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Sep 25, 2025
- Permits on file
- 330
- Phone
- (817) 917-5697
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wheeler Operating Corporation |
| Production reports | Wheeler Operating Corporationthrough Feb 2001 |
| Latest permit | Wheeler Operating CorporationJan 15, 1997 |
- 5,500
- total depth, ft
- 1
- permits on file
- Jan 15, 1997
- last permit issued
- Mar 14, 1997
- completed
- 30.1K
- cumulative oil, bbl
- 9.84K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1996 THROUGH Aug 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 14, 1997
- Shut in
- —
- Plugged
- May 22, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 19 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Connell Estate 937 O-11-67653 | Post (Glorieta) | Wheeler Operating Corporation | 19 | 30.1K | 9.84K | Oct 1996 – Aug 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rocker a Operating CompanyOct 1996 → Nov 1996
- 2Wheeler Operating CorporationDec 1996 → Feb 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 457253-99 | Drill | Wheeler Operating Corporation | Jan 10, 1997 | Jan 15, 1997 | Feb 18, 1997 | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-67653 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,289 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San AndresSAN ANDRES POROSITY | 2,106 | 183 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,414 | 2,490 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 251 | 12.25 | 180 S |
| 5.5 | 2,414 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 7, 1998 | May 15, 1997 | Yes |
| 00 | Dec 16, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-169-33432 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-169-33432 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 176K
- bbl, all reported
- May 2001
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000086302 | H-1 Injection | Plugged Jul 16, 2001 | 500 | 1,200 | 2,414–2,490 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 29,848(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/16933432, documented in the API reference.