WELL · 42-169-33877 · DISTRICT 8

Crump #7

N

Garza County · Rocker -a- South (Glorieta) field  · Vertical

Crump #7 (API 42-169-33877) is a well in Garza County operated by D & D Oil CO. #2, completed April 1, 2008.

The RRC has issued 2 drilling permits between 2007 and 2013, permitted to 3,300 ft.

It was permitted by Palmer Oil Properties and has since transferred to D & D Oil CO. #2 on the wellbore schedule.

Completion filings report 10 formation tops, including Yates, San Andres, Glorieta, Clear Fork.

Its 2 leases have reported 74K barrels of oil since March 2005, last reporting in July 2026. The leases carry 12 wells, so these are lease totals, not this well alone.

Operator of record

D & D Oil Co. #2

Permitted by Palmer Oil Properties; the EWA schedule now lists a different operator.

Post, TX · P-5 Y, filed Oct 4, 2025 · 4 permits on file · (806) 782-3019

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleD & D Oil Co. #2
Production reportsD & D Oil Co. #2through Jan 2026
Latest permitPalmer Oil PropertiesOct 1, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,300
total depth, ft
2
permits on file
Oct 1, 2013
last permit issued
Apr 1, 2008
completed
74K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 1, 2008
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 12 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Crump O-11-68753Rocker -a-, South (Glorieta)D & D Oil Co. #2752.5K0Mar 2005 – Jul 2026
Crump O-11-68893Rocker -a-, South (San Andres)D & D Oil Co. #2521.5K0Jan 2006 – Jul 2026

Oil, barrels lease total

Last 12 months 857 · prior 12 1,748(-51%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Palmer Oil PropertiesMar 2005 → Jul 2023
  2. 2D & D Oil Co. #2Aug 2023 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
770522-99RecompletionPalmer Oil PropertiesSep 23, 2013Oct 1, 2013Jan 5, 20143,200
646720-99DrillPalmer Oil PropertiesSep 25, 2007Sep 28, 2007Dec 14, 20073,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-68753————
—— O-11-68893————

Formation tops

As filed on W-2/G-1. Subsea from 2,280 ft elevation.Download CSV →

FormationMD ftSubsea
YatesYATES - HEAVY WATER AND GAS FLOW7251,555
San AndresSAN ANDRES - ACTIVE CO2 FLOOD2,306-26
San AndresSAN ANDRES PER JERRY TYLER2,330-50
Glorieta2,998-718
Glorieta3,000-720
Clear ForkCLEARFORK——
Ellenburger——
Mississippian——
Spraberry——
Strawn——
Wichita-AlbanyWICHITA——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
2,4082,440Perforated
3,0653,084Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516012.25130 S
5.53,1187.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 15, 2015Oct 15, 2015Yes
00Sep 9, 2008Jun 25, 2008Yes
00Aug 26, 2008—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16933877, documented in the API reference.