TEXAS · WELLS · GLASSCOCK COUNTY · API 42-173-32076 · DISTRICT 08

Utpc #1801

Plugged

Glasscock County  · Vertical

Utpc #1801 (API 42-173-32076) is a plugged well in Glasscock County, plugged June 25, 1989, last operated by IP Petroleum Company, Inc..

The RRC has issued one drilling permit (amended once), issued May 11, 1989, permitted to 8,500 ft.

Operator of record

IP Petroleum Company, Inc.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 22, 2000
Permits on file
1,112
Phone
(713) 951-4524

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitIP Petroleum Company, Inc.May 11, 1989
8,500
total depth, ft
2
permits on file
May 11, 1989
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jun 25, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
359180-98DrillIP Petroleum Company, Inc.May 25, 1989May 11, 1989Jun 2, 19898,500
359180-99DrillIP Petroleum Company, Inc.May 11, 1989May 11, 1989—8,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17332076, documented in the API reference.