TEXAS · WELLS · GLASSCOCK COUNTY · MUSTANG DRAW 13 LEASE · API 42-173-32465 · DISTRICT 7B

Mustang Draw 13 #1

Shut in

Glasscock County · Tenison (Wolfcamp) field · Shut In  · Vertical

Mustang Draw 13 #1 (API 42-173-32465) is a well in Glasscock County operated by New Height Energy LLC, completed March 1, 1996 and listed as shut in on the RRC schedule, shut in January 1, 1998.

The RRC has issued 2 drilling permits between 1994 and 1995, permitted to 11,370 ft.

It was permitted by Patterson Petroleum, Inc. and has since transferred to New Height Energy LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Wolfcamp, Strawn, Mississippian, Devonian.

Its lease has reported 714 barrels of oil and 304 mcf of gas since December 1994, last reporting in July 2026.

It holds an active disposal or injection permit.

Operator of record

New Height Energy LLC

Permitted by Patterson Petroleum, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Phone
(432) 269-1562

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsPatterson Petroleum, Inc.through Aug 1995
Latest permitPatterson Petroleum, Inc.Aug 22, 1995
11,370
total depth, ft
2
permits on file
Aug 22, 1995
last permit issued
Mar 1, 1996
completed
714
cumulative oil, bbl
304
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 1, 1996
Shut in
Jan 1, 1998
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mustang Draw 13 O-10-34342Tenison (Wolfcamp)New Height Energy, LLC1714304Dec 1994 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Patterson Petroleum, Inc.Dec 1994 → Aug 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
439091-99RecompletionPatterson Petroleum, Inc.Aug 18, 1995Aug 22, 1995Aug 15, 199511,370
429258-99DrillPatterson Petroleum, Inc.Oct 20, 1994Oct 24, 1994Nov 2, 199411,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 1, 1996Mustang Draw 13 O-10-34342Tenison (Wolfcamp)New Height Energy LLCShut In · shut in Jan 1, 199811,370

Formation tops

As filed on W-2/G-1. Subsea from 2,615 ft elevation.Download CSV →

FormationMD ftSubsea
Wolfcamp8,448-5,833
Strawn10,058-7,443
MississippianMISSISSIPPI10,711-8,096
Devonian10,864-8,249
Fusselman11,262-8,647

Perforations

Perforated and open-hole intervals.

FromToType
3,6104,756Perforated
8,8128,893Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37532417.5365 S
9.6253,60212.251,200 S
5.53,6108.75570 S
5.59,2198.75550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 27, 1996Mar 11, 1996—
00Feb 15, 1995Dec 16, 1994Yes
00Dec 27, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
201K
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000083192W-14 DisposalActive2,0001,4403,610–4,800

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17332465, documented in the API reference.