TEXAS · WELLS · GLASSCOCK COUNTY · API 42-173-32998 · DISTRICT 08

Calverley "44" #1

Plugged

Glasscock County  · Vertical

Calverley "44" #1 (API 42-173-32998) is a plugged well in Glasscock County, plugged February 28, 2000, last operated by Mewbourne Oil CO..

The RRC has issued 2 drilling permits (amended once) between 1997 and 1999, permitted to 8,400 ft.

Operator of record

Mewbourne Oil Co.

Based in
Tyler, TX
P-5 status
Active (A)
P-5 last filed
May 21, 2026
Permits on file
2,061
Phone
(903) 561-2900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitMewbourne Oil Co.Oct 20, 1999
8,400
total depth, ft
3
permits on file
Oct 20, 1999
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Feb 28, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
488650-98DrillMewbourne Oil Co.Feb 7, 2000Oct 20, 1999—8,400
488650-99DrillMewbourne Oil Co.Oct 19, 1999Oct 20, 1999Feb 6, 20008,400
460170-99DrillMewbourne Oil Co.Mar 20, 1997Mar 21, 1997—8,200

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17332998, documented in the API reference.