TEXAS · WELLS · GLASSCOCK COUNTY · API 42-173-33780 · DISTRICT 7B

Zant Hurt 38 #3802

Plugged

Glasscock County · Spraberry (Trend Area) field  · Vertical

Zant Hurt 38 #3802 (API 42-173-33780) is a plugged well in Glasscock County, plugged January 12, 2026, last operated by Xto Energy Inc..

The RRC has issued one drilling permit (amended once), issued September 1, 2010, permitted to 11,000 ft.

It was permitted by Piedra Operating, LLC and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Spraberry, Wolfcamp, Strawn.

Its 2 leases have reported 7.71M barrels of oil and 31M mcf of gas since August 2008, last reporting in July 2026. The leases carry 55 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Permitted by Piedra Operating, LLC; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitPiedra Operating, LLCSep 1, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
2
permits on file
Sep 1, 2010
last permit issued
Feb 8, 2011
completed
7.71M
cumulative oil, bbl
31M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 8, 2011
Shut in
—
Plugged
Jan 12, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 55 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Zant O-10-38900Spraberry (Trend Area)XTO Energy Inc.517.71M31MAug 2008 – Jul 2026
Zant Hurt 38 O-10-54435Spraberry (Trend Area)XTO Energy Inc.400Aug 2020 – Jul 2026

Gas, mcf lease total

Last 12 months 3,262,449 · prior 12 3,547,165(-8%)

0200K400K202420252026

Oil, barrels lease total

Last 12 months 93,643 · prior 12 156,695(-40%)

010K20K30K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cambrian Management, Ltd.Aug 2008 → Aug 2008
  2. 2Piedra Operating, LLCSep 2008 → Feb 2011
  3. 3Berry Oil Comp.Mar 2011 → Jun 2014
  4. 4Linn Operating, Inc.Jul 2014 → Oct 2014
  5. 5XTO Energy Inc.Nov 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
701213-98DrillPiedra Operating, LLCNov 22, 2011Sep 1, 2010Dec 26, 201011,000
701213-99DrillPiedra Operating, LLCAug 25, 2010Sep 1, 2010Dec 26, 201011,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 8, 2011Zant Hurt 38 O-10-54435Spraberry (Trend Area)XTO Energy Inc.Plugged—
Feb 8, 2011Zant O-10-38900Spraberry (Trend Area)XTO Energy Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,608 ft elevation.Download CSV →

FormationMD ftSubsea
Spraberry6,788-4,180
Wolfcamp8,336-5,728
Strawn10,166-7,558

Perforations

Perforated and open-hole intervals.

FromToType
8,62710,267Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37543017.5350 S
8.6255,237111,300 S
5.510,5237.8751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 1, 2020Aug 16, 2012—
00Jul 18, 2013Aug 16, 2012—
00Dec 9, 2011Mar 23, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17333780, documented in the API reference.