WELL · 42-173-34024 · DISTRICT 8

Glasscock -N- Fee #12

Plugged

Glasscock County · Spraberry (Trend Area) field  · Vertical

Glasscock -N- Fee #12 (API 42-173-34024) is a plugged well in Glasscock County, plugged January 23, 2026, last operated by Xto Energy Inc..

The RRC has issued 2 drilling permits (amended twice) between 2011 and 2012, permitted to 11,300 ft.

Completion filings report 6 formation tops, including Wolfcamp, Mississippian, Woodford, Devonian.

Its 3 leases have reported 1.77M barrels of oil and 3.29M mcf of gas since January 1993, last reporting in July 2026. The leases carry 22 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitXTO Energy Inc.Aug 1, 2012
11,300
total depth, ft
4
permits on file
Aug 1, 2012
last permit issued
Jun 27, 2019
completed
1.77M
cumulative oil, bbl
3.29M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 27, 2019
Shut in
—
Plugged
Jan 23, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 22 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Glasscock -N- Fee O-10-40723Spraberry (Trend Area)XTO Energy Inc.1085.9K67.4KNov 2010 – Jul 2026
Glasscock -N- Fee O-10-29129Blalock Lake, SE (Wolfcamp)XTO Energy Inc.111.68M3.22MJan 1993 – Apr 2020
Glasscock N Fee O-10-41536Hill Ranch (Miss)XTO Energy Inc.14122.9KSep 2011 – Oct 2013

Oil, barrels lease total

Last 12 months 11,494 · prior 12 13,083(-12%)

01K2K202420252026

Gas, mcf lease total

Last 12 months 8,018 · prior 12 7,607(+5%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Jul 2004
  3. 3XTO Energy Inc.Aug 2004 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
743077-99RecompletionXTO Energy Inc.Jun 19, 2012Aug 1, 2012Apr 13, 201211,185
709621-97DrillXTO Energy Inc.Aug 8, 2011Feb 11, 2011Jun 11, 201111,300
709621-98DrillXTO Energy Inc.Jul 26, 2011Feb 11, 2011Jun 11, 201111,300
709621-99DrillXTO Energy Inc.Feb 2, 2011Feb 11, 2011Jun 11, 201111,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-29129————
—— O-10-40723————
—— O-10-41536————

Formation tops

As filed on W-2/G-1. Subsea from 2,728 ft elevation.Download CSV →

FormationMD ftSubsea
Wolfcamp7,789-5,061
Mississippian10,203-7,475
Woodford10,518-7,790
Devonian10,557-7,829
Sylvan10,780-8,052
Fusselman10,914-8,186

Perforations

Perforated and open-hole intervals.

FromToType
8,1048,198Perforated
10,35610,517Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37540817.5495 S
9.6253,10212.251,000 S
711,1708.751,010 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 14, 2025Oct 29, 2025—
00Mar 2, 2020Sep 10, 2012—
00Aug 8, 2013Sep 10, 2012—
00Jun 15, 2012Oct 14, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17334024, documented in the API reference.