WELL · 42-173-36938 · DISTRICT 8

Hughes SWD #2

WaterY

Glasscock County · Deadwood West (Strawn) field · Injection  · Vertical

Hughes Swd #2 (API 42-173-36938) is a well in Glasscock County operated by Pilot Water Solutions Permianllc, completed May 15, 2025 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued October 13, 2014, permitted to 5,300 ft.

It was permitted by Rbj & Associates, LLC and has since transferred to Pilot Water Solutions Permianllc on the wellbore schedule.

Completion filings report 10 formation tops, including Santa Rosa, Yates, Seven Rivers, Queen.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 204K barrels injected in the 12 months reported through January 2026.

Operator of record

Pilot Water Solutions Permianllc

Permitted by RBJ & Associates, LLC; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed May 4, 2026 · 21 permits on file · (432) 699-9366

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePilot Water Solutions Permianllc
Production reportsnone
Latest permitRBJ & Associates, LLCOct 13, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,300
total depth, ft
1
permits on file
Oct 13, 2014
last permit issued
May 15, 2025
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 15, 2025
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hughes SWD O-10-46339Deadwood, West (Strawn)Pilot Water Solutions Permianllc100Jan 2015 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
798009-99DrillRBJ & Associates, LLCOct 8, 2014Oct 13, 2014Oct 19, 20145,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-46339————

Formation tops

As filed on W-2/G-1. Subsea from 2,523 ft elevation.Download CSV →

FormationMD ftSubsea
Santa Rosa1,0001,523
Yates1,2501,273
Seven Rivers1,3001,223
Queen1,5001,023
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO1,850673
Glorieta2,45073
Clear ForkCLEARFORK2,650-127
Grayburg2,850-327
Spraberry——
Wichita-AlbanyWICHITA ALBANY——

Perforations

Perforated and open-hole intervals.

FromToType
4,1505,150Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7530612.25110 S
10.7530812.25110 S
74,1508.75725 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 9, 2025May 23, 2025—
00Jun 29, 2015May 5, 2015—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

204K
bbl, last 12 reported months
11.6M
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000110215W-14 DisposalActive25,0002,0754,150–5,150

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 203,808 · prior 12 636,912(-68%)

050K100K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17336938, documented in the API reference.