WELL · 42-173-37578 · DISTRICT 8
Nathaniel #3616
Glasscock County · Jailhouse (Fusselman) field · Shut IN · Vertical
Nathaniel #3616 (API 42-173-37578) is a well in Glasscock County operated by Lake Crystal Operating LLC, completed June 11, 2017 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued April 24, 2017, permitted to 11,000 ft.
It was permitted by Cinnabar Operating, LLC and has since transferred to Lake Crystal Operating LLC on the wellbore schedule.
Completion filings report 10 formation tops, including Santa Rosa, Yates, Seven Rivers, Queen.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Cinnabar Operating, LLC; the EWA schedule now lists a different operator.
Sugar Land, TX · P-5 Y, filed Oct 4, 2025 · (314) 805-9163
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lake Crystal Operating LLC |
| Production reports | none |
| Latest permit | Cinnabar Operating, LLCApr 24, 2017 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,000
- total depth, ft
- 1
- permits on file
- Apr 24, 2017
- last permit issued
- Jun 11, 2017
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2017 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 11, 2017
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nathaniel O-10-52241 | Jailhouse (Fusselman) | Lake Crystal Operating LLC | 1 | 0 | 0 | Oct 2017 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 825429-99 | Drill | Cinnabar Operating, LLC | Apr 12, 2017 | Apr 24, 2017 | May 29, 2017 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-52241 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,527 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Santa Rosa | 767 | 1,760 |
| Yates | 1,523 | 1,004 |
| Seven Rivers | 1,810 | 717 |
| Queen | 1,945 | 582 |
| Grayburg | 2,120 | 407 |
| San AndresSAN ANDRES - HIGH FLOWS, H2S, CO | 2,327 | 200 |
| Glorieta | 3,370 | -843 |
| Clear ForkCLEARFORK | 4,122 | -1,595 |
| Wichita-AlbanyWICHITA ALBANY | 5,770 | -3,243 |
| Spraberry | 6,940 | -4,413 |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 448 | 17.25 | 495 S |
| 8.625 | 4,204 | 11 | 750 S |
| 5.5 | 10,632 | 7.875 | 130 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 7, 2019 | Jul 16, 2019 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-173-37578 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-173-37578 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17337578, documented in the API reference.