TEXAS · WELLS · GOLIAD COUNTY · API 42-175-00620 · DISTRICT 02

Lytton #1

Plugged

Goliad County · Brandt (Yegua 4700) field  · Vertical

Lytton #1 (API 42-175-00620) is a plugged well in Goliad County, plugged September 28, 2011, last operated by Wagner Oil Company.

The RRC has issued 2 drilling permits between 1990 and 1999, permitted to 7,753 ft.

Completion filings report 4 formation tops, including Yegua, Recklaw, Luling, Wilcox.

Its 3 leases have reported 3.24K barrels of oil and 638K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Wagner Oil Company

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Dec 23, 2025
Permits on file
278
Phone
(817) 335-2222

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWagner Oil Company
Production reportsWagner Oil Companythrough May 2011
Latest permitWagner Oil CompanyApr 19, 1999
7,753
total depth, ft
2
permits on file
Apr 19, 1999
last permit issued
Apr 21, 1999
completed
3.24K
cumulative oil, bbl
638K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 21, 1999
Shut in
—
Plugged
Sep 28, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lytton G-2-173840Brandt (Yegua 4700)Wagner Oil Company1230270KApr 1999 – May 2011
Lytton G-2-135561Brandt (Recklaw)Wagner Oil Company13.01K368KJan 1993 – Mar 1999
— G-2-995——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mitchell Energy CorporationJan 1993 → Jul 1996
  2. 2Wagner, Duer & Co.Aug 1996 → Dec 1997
  3. 3Wagner Oil CompanyJan 1998 → May 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
483849-99RecompletionWagner Oil CompanyApr 14, 1999Apr 19, 1999Apr 19, 19994,653
372691-99RecompletionMitchell Energy CorporationApr 27, 1990May 22, 1990—7,753

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 21, 1999Lytton G-2-173840Brandt (Yegua 4700)Wagner Oil CompanyPlugged—
Jul 27, 1990Lytton G-2-135561Brandt (Recklaw)Wagner Oil CompanyPlugged—
May 1, 1985Lytton G-2-995Brandt (Yegua 4700)Mitchell Energy CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 18 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua4,598-4,580
Recklaw7,454-7,436
Luling7,584-7,566
Wilcox7,710-7,692

Perforations

Perforated and open-hole intervals.

FromToType
4,6034,608Perforated
4,6344,648Perforated
4,6594,663Perforated
4,6594,673Perforated
4,6664,673Perforated
7,4567,468Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,02014500 S
10.751,020——
5.57,7518.75350 S
5.57,751——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 25, 1999May 26, 1999Yes
00Aug 17, 1999——
00Dec 19, 1990Aug 13, 1990Yes
00Sep 8, 1990——
00Jun 24, 1985May 16, 1985—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17500620, documented in the API reference.