TEXAS · WELLS · GOLIAD COUNTY · API 42-175-02053 · DISTRICT 02

Wilson Deep Gas Unit #1

Plugged

Goliad County · Dallas Husky (Wilcox 9000) field  · Vertical

Wilson Deep Gas Unit #1 (API 42-175-02053) is a plugged well in Goliad County, plugged January 21, 1988, last operated by Zeitgeist Exploration Company.

The RRC has issued one drilling permit, issued March 26, 1985, permitted to 9,329 ft.

It was permitted by Texaco Inc. and has since transferred to Zeitgeist Exploration Company on the wellbore schedule.

Operator of record

Zeitgeist Exploration Company

Permitted by Texaco Inc.; the EWA schedule now lists a different operator.

Based in
Corpus Chrsti, TX
P-5 status
Inactive (I)
P-5 last filed
May 19, 1987
Permits on file
1
Phone
(512) 887-9072

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleZeitgeist Exploration Company
Production reportsnone
Latest permitTexaco Inc.Mar 26, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,329
total depth, ft
1
permits on file
Mar 26, 1985
last permit issued
Feb 3, 1972
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 3, 1972
Shut in
—
Plugged
Jan 21, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
270557-99RecompletionTexaco Inc.Mar 25, 1985Mar 26, 1985—9,329

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 3, 1972Wilson Deep Gas Unit G-2-51998Dallas Husky (Wilcox 9000)Zeitgeist Exploration CompanyPlugged—
Oct 1, 1967— G-2-42750Dallas Husky E. (9200)Texaco Inc.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
8,6768,690Perforated
8,6948,706Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.375345——
9.6253,009—710 S
4.59,314—310 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 24, 1985May 2, 1985—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17502053, documented in the API reference.