TEXAS · WELLS · GOLIAD COUNTY · COOPER, CHRISTINA C. LEASE · API 42-175-30111 · DISTRICT 02

Cooper Christina C. #1

Plugged

Goliad County · Tejas (Frio 5100) field  · Vertical

Cooper Christina C. #1 (API 42-175-30111) is a plugged well in Goliad County, plugged June 18, 2004, last operated by Charro Operating L.L.C..

The RRC has issued one drilling permit, issued October 24, 1989, permitted to 6,031 ft.

It was permitted by EP Operating Company and has since transferred to Charro Operating L.L.C. on the wellbore schedule.

Its lease has reported 323K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Charro Operating L.L.C.

Permitted by EP Operating Company; the EWA schedule now lists a different operator.

Based in
Englewood, CO
P-5 status
Active (A)
P-5 last filed
Apr 10, 2026
Permits on file
326
Phone
(361) 319-3199

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCharro Operating L.L.C.
Production reportsCharro Operating, L.L.C.through Jan 2000
Latest permitEP Operating CompanyOct 24, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,031
total depth, ft
1
permits on file
Oct 24, 1989
last permit issued
Apr 9, 1972
completed
0
cumulative oil, bbl
323K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1995 THROUGH Jan 2000

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 9, 1972
Shut in
—
Plugged
Jun 18, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cooper, Christina C. G-2-53652Tejas (Frio 5100)Charro Operating, L.L.C.10323KJan 1993 – Jan 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Export Petroleum CorporationAug 1995 → May 1998
  2. 2Charro Operating, L.L.C.Jun 1998 → Jan 2000

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
365490-99RecompletionEP Operating CompanyOct 23, 1989Oct 24, 1989—6,031

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 9, 1972Cooper Christina C. G-2-53652Tejas (Frio 5100)Charro Operating L.L.C.Plugged—

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62541412.25—
4.55,2767.875795 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Apr 26, 1972—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17530111, documented in the API reference.