WELL · 42-175-30236 · DISTRICT 2

Hall #1

Plugged

Goliad County · Wilhelm (1925) field  · Vertical

Hall #1 (API 42-175-30236) is a plugged well in Goliad County, plugged January 9, 2003, last operated by Exploreco Energy Inc..

The RRC has issued 5 drilling permits between 1978 and 1985, permitted to 3,300 ft.

It was permitted by Txo Production Corp. and has since transferred to Exploreco Energy Inc. on the wellbore schedule.

Completion filings report one formation top, including Miocene (undifferentiated).

Operator of record

Exploreco Energy Inc.

Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Jul 9, 2003
Permits on file
4
Phone
(281) 922-7473

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitTXO Production Corp.Oct 16, 1985
3,300
total depth, ft
5
permits on file
Oct 16, 1985
last permit issued
Oct 20, 1985
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 20, 1985
Shut in
—
Plugged
Jan 9, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hall G-2-118972Wilhelm (1925)Exploreco Energy, Inc.100Jan 1993 – Jan 2003
— G-2-57709——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
287854-99RecompletionTXO Production Corp.Oct 15, 1985Oct 16, 1985—2,300
206703-99RecompletionTXO Production Corp.Aug 16, 1983Aug 22, 1983—2,485
190008-99RecompletionTXO Production Corp.Mar 30, 1983Mar 30, 1983—2,485
157474-99RecompletionTXO Production Corp.Apr 20, 1982Apr 20, 1982—3,300
28848-99RecompletionTexas Oil & Gas Corp.Jul 20, 1978Jul 20, 1978—3,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-57709————
—— G-2-118972————

Formation tops

As filed on W-2/G-1. Subsea from 167 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)TOP OF MIOCENE1,850-1,683

Perforations

Perforated and open-hole intervals.

FromToType
1,9201,925Perforated
2,4612,168Perforated
2,4862,500Perforated
2,9372,942Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62548212.25360 S
8.62548231,214 S
2.8753,1827.875770 S
2.8753,1837.875770 S
2.8753,1837778 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 5, 1985Nov 7, 1985Yes
00Dec 4, 1985——
00Jan 12, 1984Apr 14, 1983—
00Jan 12, 1984May 6, 1982—
00Jan 12, 1984Sep 6, 1978—
00Jan 12, 1984Feb 26, 1974—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17530236, documented in the API reference.