WELL · 42-175-30573 · DISTRICT 2

O'Connor, L.W. Estate 'A' #64

N

Goliad County  · Vertical

O'Connor, L.W. Estate 'A' #64 (API 42-175-30573) is a permitted well in Goliad County filed by Kamlok Oil & Gas, Inc.; no completion report is on file yet.

The RRC has issued 4 drilling permits between 1980 and 1993, permitted to 5,300 ft.

Operator of record

Kamlok Oil & Gas, Inc.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 20, 1995
Permits on file
184
Phone
(713) 466-0980

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHilcorp Energy Companythrough Oct 1997
Latest permitKamlok Oil & Gas, Inc.Dec 15, 1993
5,300
total depth, ft
4
permits on file
Dec 15, 1993
last permit issued
—
completed
0
cumulative oil, bbl
21.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2002

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
O'Connor, L.W. Estate 'A' G-2-148060Live Oak Lake (4980)Hilcorp Energy Company106.64KDec 1993 – May 2002
Oconnor, L. W. Estate -A- G-2-97156Live Oak Lake (Consolidated)Kamlok Oil & Gas, Inc.1015.3KJan 1993 – Dec 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Kamlok Oil & Gas, Inc.Jan 1993 → Jan 1994
  2. 2Hilcorp Energy CompanyAug 1997 → Oct 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
419364-99RecompletionKamlok Oil & Gas, Inc.Dec 15, 1993Dec 15, 1993Dec 18, 19935,300
393424-99RecompletionKamlok Oil & Gas, Inc.Oct 29, 1991Oct 29, 1991—5,300
147364-99RecompletionAmoco Production CompanyDec 31, 1981Dec 31, 1981—5,300
90474-99RecompletionAmoco Production CompanyAug 21, 1980Aug 21, 1980—5,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-97156————
—— G-2-148060————

Perforations

Perforated and open-hole intervals.

FromToType
4,0504,054Perforated
4,6814,691Perforated
4,8204,829Perforated
4,9884,996Perforated
5,099—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,000151,010 S
10.752,00014.751,075 S
2.3753,905——
75,050114 S
75,298111,175 S
75,3009.875540 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 6, 1994Jan 12, 1994Yes
00Feb 25, 1994——
00Dec 21, 1992Sep 24, 1992—
00Jan 12, 1984Jan 4, 1982—
00Jan 12, 1984Apr 15, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17530573, documented in the API reference.