TEXAS · WELLS · GOLIAD COUNTY · OCONNOR, L.W. EST. -A- LEASE · API 42-175-31026 · DISTRICT 02

Oconnor L.W. Est. -A- #66

Plugged

Goliad County · Live Oak Lake (Consolidated) field  · Directional

Oconnor L.W. Est. -A- #66 (API 42-175-31026) is a plugged well in Goliad County, plugged February 17, 1998, last operated by Hilcorp Energy Company.

The RRC has issued 6 drilling permits between 1977 and 1991, permitted to 5,250 ft.

It was permitted by Kamlok Oil & Gas, Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Operator of record

Hilcorp Energy Company

Permitted by Kamlok Oil & Gas, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsnone
Latest permitKamlok Oil & Gas, Inc.Apr 2, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,250
total depth, ft
6
permits on file
Apr 2, 1991
last permit issued
Mar 25, 1988
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 25, 1988
Shut in
—
Plugged
Feb 17, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Oconnor, L.W. Est. -A- G-2-124944Live Oak Lake (Consolidated)Hilcorp Energy Company100Jan 1993 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
385207-99RecompletionKamlok Oil & Gas, Inc.Feb 28, 1991Apr 2, 1991—5,200
341635-99RecompletionAmoco Production CompanyJan 20, 1988Feb 16, 1988—5,250
330376-99RecompletionAmoco Production CompanyMay 18, 1987Jun 11, 1987—5,200
302809-99RecompletionAmoco Production CompanyApr 11, 1986May 29, 1986—5,200
298850-99RecompletionAmoco Production CompanyApr 11, 1986Mar 3, 1986—5,200
15244-99DrillAmoco Production CompanyDec 13, 1977Dec 13, 1977—5,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 25, 1988Oconnor L.W. Est. -A- G-2-124944Live Oak Lake (Consolidated)Hilcorp Energy CompanyPlugged—
Mar 25, 1988Oconnor L.W. Est. -A- G-2-124944Live Oak Lake (Consolidated)Hilcorp Energy CompanyPlugged—
—Oconnor L. W. Estate -A- O-2-3839Live Oak Lake (5000)Hilcorp Energy CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
4,7274,735Perforated
4,9084,916Perforated
5,0345,039Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,02814.751,050 S
75,2509.8751,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 17, 1988Apr 18, 1988—
00Sep 17, 1987Jul 30, 1987Yes
00Sep 5, 1987——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17531026, documented in the API reference.