WELL · 42-175-31043 · DISTRICT 2

Hardeman #2

Plugged

Goliad County · Terrell Point (2800) field  · Vertical

Hardeman #2 (API 42-175-31043) is a plugged well in Goliad County, plugged January 7, 1988, last operated by Txo Production Corp..

The RRC has issued 3 drilling permits between 1978 and 1983, permitted to 5,400 ft.

Operator of record

TXO Production Corp.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 2, 1990
Permits on file
3,227
Phone
(214) 954-2086

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXO Production Corp.
Production reportsnone
Latest permitTXO Production Corp.Sep 15, 1983
5,400
total depth, ft
3
permits on file
Sep 15, 1983
last permit issued
Sep 21, 1983
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 21, 1983
Shut in
—
Plugged
Jan 7, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
212604-99RecompletionTXO Production Corp.Sep 29, 1983Sep 15, 1983—5,212
42998-99RecompletionTexas Oil & Gas Corp.Feb 22, 1979Feb 22, 1979—5,212
15828-99DrillTexas Oil & Gas Corp.Jan 9, 1978Jan 9, 1978—5,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 21, 1983Hardeman G-2-107379Terrell Point (2800)TXO Production Corp.Plugged—
Feb 26, 1979Hardeman G-2-81857Fannin South (3600)TXO Production Corp.Plugged—
Jan 25, 1978Hardeman G-2-76301Fannin South (4800)Texas Oil & Gas Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
2,8962,899Perforated
3,7063,712Perforated
4,8114,817Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62549512.25350 S
2.8755,1877.8751,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Oct 1, 1983—
00Jan 12, 1984Apr 24, 1979—
00Jan 12, 1984Mar 3, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17531043, documented in the API reference.