TEXAS · WELLS · GOLIAD COUNTY · API 42-175-31065 · DISTRICT 02
Vinton Irene #1
Goliad County · Danforth (2580) field · Vertical
Vinton Irene #1 (API 42-175-31065) is a plugged well in Goliad County, plugged February 15, 1984, last operated by Txo Production Corp..
The RRC has issued 4 drilling permits between 1978 and 1983, permitted to 4,000 ft.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 2, 1990
- Permits on file
- 3,227
- Phone
- (214) 954-2086
SOURCE · RRC EWA WELLBORE SCHEDULE
- 4,000
- total depth, ft
- 4
- permits on file
- Aug 10, 1983
- last permit issued
- Sep 1, 1983
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 1, 1983
- Shut in
- —
- Plugged
- Feb 15, 1984
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 205082-99 | Recompletion | TXO Production Corp. | Aug 10, 1983 | Aug 10, 1983 | — | 2,850 |
| 190772-99 | Recompletion | TXO Production Corp. | Apr 5, 1983 | Apr 5, 1983 | — | 4,000 |
| 140668-99 | Recompletion | Kilroy Company of Texas, Inc. | Nov 13, 1981 | Nov 13, 1981 | — | 3,033 |
| 19751-99 | Drill | Kilroy Company of Texas, Inc. | Mar 10, 1978 | Mar 10, 1978 | Mar 20, 1978 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 1, 1983 | Vinton Irene G-2-107508 | Danforth (2580) | TXO Production Corp. | Plugged | — |
| Apr 8, 1983 | Vinton Irene G-2-105904 | Danforth (2960) | TXO Production Corp. | Plugged | — |
| Oct 16, 1981 | Vinton Irene G-2-96594 | Danforth (2875 ) | TXO Production Corp. | Plugged | — |
| Mar 30, 1979 | Vinton Irene G-2-83416 | Danforth (Frio 2070) | TXO Production Corp. | Plugged | — |
| Mar 30, 1978 | Vinton Irene G-2-83417 | Danforth (Frio 3125) | TXO Production Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,071 | 2,077 | Perforated |
| 2,071 | 2,882 | Perforated |
| 2,576 | 2,580 | Perforated |
| 2,963 | 2,968 | Perforated |
| 3,124 | 3,128 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 520 | 12.25 | 370 S |
| 2.375 | 2,184 | — | — |
| 2.375 | 2,518 | — | — |
| 2.375 | 3,070 | — | — |
| 4.5 | 4,000 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Oct 12, 1983 | — |
| 00 | Jan 12, 1984 | Apr 18, 1983 | — |
| 00 | Jan 12, 1984 | Nov 13, 1981 | — |
| 00 | Jan 12, 1984 | Jul 23, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-31065 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-31065 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17531065, documented in the API reference.