TEXAS · WELLS · GOLIAD COUNTY · JACOB, MATILDA LEASE · API 42-175-31124 · DISTRICT 02
Jacob Matilda #2
Goliad County · Mission Valley W.(miocene 1350) field · Vertical
Jacob Matilda #2 (API 42-175-31124) is a plugged well in Goliad County, plugged December 17, 2013, last operated by Marwell Petroleum Ltd Partnrship.
The RRC has issued one drilling permit, issued July 11, 1978, permitted to 2,000 ft.
It was permitted by Equitable Petroleum Corp. and has since transferred to Marwell Petroleum Ltd Partnrship on the wellbore schedule.
Its lease has reported 100K mcf of gas since January 1993, with no volume in the three years through April 2026.
Operator of record
Marwell Petroleum Ltd Partnrship
Permitted by Equitable Petroleum Corp.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 22, 2026
- Permits on file
- 2
- Phone
- (713) 781-1105
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Marwell Petroleum Ltd Partnrship |
| Production reports | Marwell Petroleum Ltd Partnrshipthrough May 2011 |
| Latest permit | Equitable Petroleum Corp.Jul 11, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 1
- permits on file
- Jul 11, 1978
- last permit issued
- Sep 24, 1978
- completed
- 0
- cumulative oil, bbl
- 100K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 24, 1978
- Shut in
- —
- Plugged
- Dec 17, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jacob, Matilda G-2-79247 | Mission Valley, W.(miocene 1350) | Marwell Petroleum Ltd Partnrship | 1 | 0 | 100K | Jan 1993 – May 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Marwell Petroleum, Inc.Jan 1993 → Apr 2006
- 2Marwell Petroleum Ltd PartnrshipMay 2006 → May 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 28285-99 | Drill | Equitable Petroleum Corp. | Jul 11, 1978 | Jul 11, 1978 | — | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 24, 1978 | Jacob Matilda G-2-79247 | Mission Valley W.(miocene 1350) | Marwell Petroleum Ltd Partnrship | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,255 | 1,278 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 330 | 15 | 260 S |
| 2.375 | 1,216 | — | — |
| 6.625 | 1,458 | 8.75 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Oct 12, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-31124 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-31124 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17531124, documented in the API reference.